Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

CPIM- L. Execution and Control Exam well solved and verified

Document preview thumbnail
Preview 1 out of 3 pages

CPIM- L. Execution and Control Exam well solved and verified What input to the manufacturing planning and control system can be found in the work center file ANS-Available facilities Monitors output, compares output with capacity plans, and takes corrective actions. ANS-Capacity control In the manufacturing planning and control (MPC) hierarchy, scheduling and capacity control are part of which category ANS-Production Activity Control (Execution and control) The index that shows the priority of an order relative to other orders in a work center ANS-Critical ratio If a critical ratio is greater than one, what does it mean ANS-The order is ahead of schedule The function of selecting and sequencing available jobs to be run at each work center is known as ANS-Dispatching If a critical ratio is zero or less, what does it mean ANS-The order is already late What form of scheduling is utilized when production is scheduled from the date the customer order is received ANS-Forward scheduling The theory of constraints (TOC) describes its scheduling system as Drum-Buffer-Rope. What does rope refer to ANS-The production pulled to the constraint for processing Increasing lead times, work in process, and material queues result from mismanaging what ANS-Input rate The theory of constraints (TOC) describes its scheduling system as Drum-Buffer-Rope. What does drum refer to ANS-The pace of production Theory of Constraints focuses on ANS-Identifying constraints, or bottlenecks, and removing them Earliest operation due date (ODD) is the dispatching rule that performs jobs according to operation due dates. ODD does what ANS-Takes into account due dates and processing times A company's entire process is only as fast as what ANS-Its bottleneck operation The theory of constraints (TOC) describes its scheduling system as Drum-Buffer-Rope. What does buffer refer to ANS-The time that inventory protects constraints Final assembly scheduling (FAS) occurs only ANS-After the customer order is received If a critical ratio is less than one, what does it mean ANS-The order is behind schedule


Document information

Uploaded on
February 6, 2024
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
111
Followers
82
Items
2228
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.