• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

GCSS-Army Maintenance Supervisor's Course Test 1 Rated A

Document preview thumbnail
Preview 1 out of 4 pages

GCSS-Army Maintenance Supervisor's Course Test 1 Rated A 1. __________ are used to schedule preventive services and inspections. d. Maintenance Plans 2. A single-cycle maintenance plan is used to schedule services using either a ________ or a ________. a. Date cycle, counter cycle 3. The __________ transaction can be used to change, activate/deactivate, and flag/unflag a maintenance plan for deletion. d. IP02 4. What process within GCSS-Army calculates the quantities needed to satisfy projected consumption or to meet immediate requirements? b. Material Requirements Planning (MRP) 5. What does the "P" indicate behind the MRP area when displaying the details of the DODAAC Report (ZFE)? d. That this is a Provisional MRP Area 6. A General Maintenance Task List can be assigned when: d. All of the above 7. When granting GCSS-Army users the authority to post goods receipts using the AIT application, what must be established for the AIT User record? a. A validity period 8. Which transaction code can be used to verify a material's on-hand quantity balance? c. /n/ISDFPS/DISP_MAT_SIT 9. Within transaction code MIGO, what Action, Reference Document, and MvT posting selections must be used to post a goods receipt for material that is considered Found on Installation (FOI)? c. A01 Goods Receipt, R10 Other, and 501 (Receipt w/o PO) 10. Which Material Requirements Planning Type indicates that a material is a bench stock item? b. PD 11. When the shop stock material initial (ZII) Purchase Requisition (PR) is saved, it is automatically __________ by GCSS-Army and it must be reviewed before it can be converted to a Purchase Order (PO). d. Parked 12. Use the __________ transaction to display the current readiness posture of your organization. b. Z_EQUST 13. True or False? Using the Equipment Status Report (ESR), a maintenance manager can review the current status of all vehicles, including which vehicles are non-mission capable and which are fully mission capable, prior to departure. a. True 14. What type of purchasing documents can be displayed in the Order Status Report? c. Purchase order documents 15. How long is a work center shift interval valid? b. For the defined validity period 16. The PP61 transaction can be used to perform the following: d. All of the above 17. What must the work center personnel shift plan profile always be set to? b. SAP_000002 (work center view) 18. Bench stock material is consumed using a________, which reduces the inventoried quantity of the material on hand. c. Goods Issue 19. A ________ is an inventory management term that denotes a physical inward goods movement of materials resulting in an increase in inventory. a. Goods Receipt 20. The aging indicators identify the age of return purchase requisitions for the materials to be turned in to your Supply Support Activity. Which aging indicator light represents a PR that is between 11 and 30 days old? b. Yellow light


Document information

Uploaded on
February 2, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StellarScores
4.0
(517)
Sold
2014
Followers
867
Items
21194
Last sold
4 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.