Process A Material Through GCSS- Army (Test B07)(2) with Complete Solutions!
What is required for work order for unit? - ANSWER-requires a part/ material What is Plant 2000? - ANSWER-Unit Plant 2001 - ANSWER-SSA MRP Area - ANSWER-Where material planning occurs Storage Location (SLoc) - ANSWER-SSA/Unit receives and Issues materials Warehouse - ANSWER-SSA material is picked or put away into storage bins What are first levels for ERP? - ANSWER-Basis of inventory management (IM) What are the last levels for ERP? - ANSWER-Basis for warehouse management (WM) STO Number - ANSWER-71000 What does creation of STO trigger - ANSWER-Perform stock check in SSA Outbound delivery number - ANSWER-80000xxxx
Written for
- Institution
- Process A Material Through GCSS-
- Course
- Process A Material Through GCSS-
Document information
- Uploaded on
- February 2, 2024
- Number of pages
- 1
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
process a material through gcss army test b072
-
process a material through gcss army stuvia
Also available in package deal