100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

GCSS-Army Unit Supply Practical Guide 2024

Rating
-
Sold
-
Pages
3
Grade
A+
Uploaded on
01-02-2024
Written in
2023/2024

The number of equipment packages authorized for sub-hand receipts is - Correct Answer unlimited What unit of measure should always be used when requesting material - Correct Answer ordering unit notifications are sent to the PBO using which gcss-army process - Correct Answer SBWP When a BOM is automatically updated and a component is either increased in quantity or added to the BOM... - Correct Answer The PB01 Work Order What transaction shows a list of PB01 Work ORders for Equipment - Correct Answer IW38 Which example below identified when an MRP is triggered to re-plan a material - Correct Answer Both Qty change in demand and Qty change to a PR or STO When using MB21 to Create a Manual reservation, what determines if the reservation will be charged to the unit cost center or to a WBS element - Correct Answer Movement type What movement type is used to manually add excess provisions discovered during an inventory into your provisional storage location - Correct Answer 501 What information can be displayed using the MD04 Transaction - Correct Answer all of the above When using the VL06i - Review the inbound delivery monitor, the user can do all fo the following except - Correct Answer return materials to the SSA When Displaying a BOM, using transaction code CS11, what key for the application would you use - Correct Answer INST-Plant Maintenance Which button do you click to change to the navigation view when executing the ZPBOSTRUC transaction - Correct Answer Navigation View When creating an email within GCSS-Army, you will use transaction code SBWP. What button do you use to create an email within GCSS - Correct Answer SAP Business Workplace What transaction is used to display a list or serial number records for your unit or SLoc - Correct Answer IQ09 Processing a post goods receipt causes what action? - Correct Answer Increases the SLoc quantity After the creation of the purchase requisition to return provisions to the SSA, the requisition needs to be converted to a purchase order. What transaction code does Unit Supply use to convert a turn-in requisition to a turn-in purchase order and process it? - Correct Answer YOBUX When you move property from one SLoc to another, what movement type do you use - Correct Answer 311 what factor causes the creation of an equipment record in GCSS - Correct Answer all of the above when issuing a component to a work order using transaction code IWBK, what does the green light mean in the availability list for materials screen? - Correct Answer enough material is on hand in the units provisional SLoc in a TDA unit where you only have one stock SLoc, the primary hand receipt FE/SLoc, what transaction is sued to establish sub-hand receipts? - Correct Answer ZEPA What transaction is used to precess a goods receipt for a lateral transfer - Correct Answer ZPBOWKBH Using ZNONSTD, who approves requests for a material master record for stock material submitted by a unit supply personnel - Correct Answer PBO What action would you take on a manual reservation when you no longer need a material to be on order - Correct Answer Delete the line or reservation What transaction code would you use to print a material document list - Correct Answer ZMB59 Using transaction code MB25, what button would you click to add additional selection criteria when running the list of reservations? - Correct Answer Dynamic Selections If a request has been created for you SLoc, and you need to review all data associated with the request, what transaction code in GCSS would you use - Correct Answer MD04 Before creating a PR for Lateral Transfer, the material should be transferred to which unit Sloc - Correct Answer CDR SLoc

Show more Read less
Institution
GCSS-Army
Course
GCSS-Army








Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
GCSS-Army
Course
GCSS-Army

Document information

Uploaded on
February 1, 2024
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
faithmuthonigitonga Arizona State University - West Campus
View profile
Follow You need to be logged in order to follow users or courses
Sold
13
Member since
1 year
Number of followers
9
Documents
453
Last sold
1 week ago

3.8

4 reviews

5
1
4
1
3
2
2
0
1
0

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions