Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 4 pages
Exam (elaborations)

UNIVERSITY EXAMINATIONS FOR THE DEGREE IN SCIENCE IN CONSTRUCTION MANAGEMENT

Document preview thumbnail
Preview 1 out of 4 pages

QUESTION ONE i. Briefly explain the importance of this study course to construction Manager (3Marks) ii. To be economically competitive, a contractor's equipment must be competitive both mechanically and economically. Briefly explain this statement (4Marks) iii. Differentiate amongst the following terminologies (3 Marks) a) Equipment b) Machinery c) Plant iv. The general aim of construction is to produce a structure at reasonable cost and at of sound workmanship within acceptable time limits. Discuss the main reasons that a manager may consider to choose machinery and not manual labour (8 Marks) v. Briefly discus the two-stroke internal combustion engine including its cycles of operation (9Marks) vi. Mention any three ways in which soil is used in construction works (3 Marks) QUESTION TWO i. Often in construction projects, soils are excavated, processed and compacted to meet certain engineering needs a) How can machinery be used to achieve optimal moisture content in soil processing works (4 Marks) b) In a construction work somewhere in Mandera County, the engineering specifications required that the soil be compacted at a moisture content of 19% to achieve a dry density of 1850Kg/m3. If water supply in the area is inadequate and the construction manager prefers to achieve the same density at a lower moisture content what options could he consider (5Marks) ii. Define the following terminologies as used in construction discipline (5Marks) a) Coarse aggregate b) Optimum moisture content c) Pavement d) Liquid Limit (LL) e) Plasticity index (PI) iii. An earthfill when completed will occupy a net volume of 142,972m3. The borrow material is stiff clay which has wet density of , water content of 16.5% and in-place void ratio, of 0.620. The fill will be compacted in layers of 200mm depth (loose measure0 and compacted to a dry density, of 1826 Kg/m3 at a moisture content of 18.3/%. Compute the required volume of borrow pit excavation (6 marks) QUESTION THREE (20MARKS)


Document information

Uploaded on
January 28, 2024
Number of pages
4
Written in
2023/2024
Type
Exam (elaborations)
Contains
Only questions
$8.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
19
Last sold
-



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.