SAFe Adv scrum master 88% Questions with Complete Answers
What might be included in a team's improvement backlog? Training needed by the team for future Iterations Re-architecture of the Solution Product Features A running list of current software defects - Training needed by the team for future Iterations What is one way a Scrum Master can gain the confidence of a stakeholder? Make the process visible Invite the stakeholder to the Iteration retrospective Make sure the results of the retrospectives are made public Establish a daily sync meeting with the stakeholder - Make the process visible What is one problem with phase-gate Milestones? They assume a point Solution exists and can be built right the first time They require the Product Owner to act as gatekeeper or guardian of the process They account for variability inherent in the process They force design decisions too late in the process - They assume a point Solution exists and can be built right the first time What is one requirement for achieving Continuous Deployment? Decouple deployment from release Automate all unit-tests Couple development cadence and deployment cadence Create all Features using behavior-driven development - Decouple deployment from release How is team performance calculated in SAFe? The ratio of business value achieved to business value planned for the PI The ratio of tasks planned to tasks completed The ratio of Story points completed to Story points planned in the PI Team member utilization as a percentage of total capacity - The ratio of business value achieved to business value planned for the PI How can a Scrum Master help the team remain focused on achieving their Iteration goals? By eliminating impediments By supporting the rules of the team process By leading a team's efforts in relentless improvements By exhibiting Lean-Agile Leadership - By eliminating impediments How are the program risks, that have been identified during PI Planning, categorized? Resolved, Owned, Accepted, Mitigated Resolved, Owned, Acknowledged, Managed Removed, Owned, Accepted, Managed Removed, Owned, Acknowledged, Mitigated - Resolved, Owned, Accepted, Mitigated What is the purpose of the scrum of scrums meeting during PI Planning? To create the program board To track planning progress across the ART To discuss scope changes To control WIP - To track planning progress across the ART Why are phase-gate Milestones problematic? They stop Solutions from failing early They use documentation and signoffs as a proxy for Solution progress They prohibit decision-making at the large-solution level They are a construct of the well established way of working - They stop Solutions from failing early If a team insists that big Stories cannot be split into smaller ones, how would the Scrum Master coach them to do otherwise? Invite a development manager to emphasize the importance of splitting Stories Demonstrate Story-splitting techniques using a specific example Emphasize the SAFe principles to highlight the importance of flow Suggest a story-splitting bootcamp in the next IP iteration - Demonstrate Story-splitting techniques using a specific example What are three opportunities for creating collaboration on a team? (Choose three.)You have reached the max number of allowed answers Pair work Communities of Practice Inspect and Adapt Hackathons Backlog refinement Iteration planning - Pair work Backlog refinement Iteration planning When should centralized decision-making be used? When there are significant economies of scale When decisions are short-term in duration When decisions need specific local context When making frequent decisions - When there are significant economies of scale Why are big Stories considered an anti-pattern? They make it difficult to apply iterative development They do not support Pair Work They make it difficult to estimate testing efforts They make it difficult to estimate compliance efforts - They make it difficult to apply iterative development What is the purpose of the Large Solution Level in SAFe? To coordinate the work of multiple Agile Teams To effectively operate in a highly regulated environment To coordinate multiple Agile Release Trains that develop the same Solution To decouple release constraints between Agile Release Trains - To coordinate multiple Agile Release Trains that develop the same Solution What are two benefits of applying cadence? (Choose two.)You have reached the max number of allowed answers To align the planning efforts of multiple Agile Release Trains To facilitate better planning and allow for more cross-team collaboration To pull the different assets of a system together and determine Solution viability To cause multiple perspectives to be understood, resolved, and integrated To transform unpredictable events into predictable events - To align the planning efforts of multiple Agile Release Trains To facilitate better planning and allow for more cross-team collaboration How is average lead time measured in a Kanban system? Measure the lead time for at least three items and calculate the statistical mean of the items By taking the average velocity over the last three iterations Measure the horizontal distance between arrival and departure lines on a cumulative flow diagram Measure the vertical distance between arrival and departure lines on a cumulative flow diagram - Measure the horizontal distance between arrival and departure lines on a cumulative flow diagram What is a Product Owner (PO) anti-pattern in Iteration planning? The PO introduces the business intent to the team for the first time The PO asks the team for recommendations on Story slicing The PO brings in changes to the planned Features based on stakeholder feedback from the System Demo The PO changes priorities of the already refined intent - The PO introduces the business intent to the team for the first time
Document information
- Uploaded on
- January 22, 2024
- Number of pages
- 19
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers