Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS WITH COMPLETE SOLUTIONS
Final Assessment Correct answers| NERC EXAM| 317 QUESTIONS WITH COMPLETE SOLUTIONS When using a dynamic schedule and the energy profile in an hour is 250 MW and the actual hourly integration deviates from the hourly energy profile by ____ the tag must be modified. A. 100 MW B. 10% C. 50 MW D. 25% Answer-B. 10% Dry steam plants, flash steam plants, and binary cycle power plants are the three main types of what kind of generating plant? A. Nuclear generators B. Combustion turbine generators C. Geothermal generators D. Hydroelectric generators Answer-C. Geothermal generators Which type of solar technology converts electromagnetic energy in sunlight directly into direct current? A. Concentrating solar thermal B. Solar DC inverter C. Photovoltaic D. Solar batteries Answer-C. Photovoltaic If a reliability coordinator identifies that there is a potential transmission related problem in the area, who should they notify? A. Marketers in the area B. Other reliability coordinators in the interconnection C. All purchasing selling entities D. Generation operators in the area of the potential problem Answer-B. Other reliability coordinators in the interconnection Restorati
Document information
- Uploaded on
- January 18, 2024
- Number of pages
- 77
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers