Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 17 pages
Exam (elaborations)

NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS

Document preview thumbnail
Preview 3 out of 17 pages

NERC book quiz| 157 questions| WITH COMPLE SOLUTIONS You are an external BA with a frequency bais of 20 MW/.1 Hz that sees a frequency of 60.02 due to a large loss of load in the contingent BA. If your generator governor control systems responded to the frequency deviation approximately how much of a generation change would you BA experience? Answer--4MW Net actual interchange minus Net scheduled interchange is what? Answer-Inadvertent interchange Suppose your interconnection operators at 59.97 Hz from one minute after midnight to noon and operate at 60.05 Hz from 12:01 to midnight. What should you do if a time error correction was implemented just after midnight to correct for the timer error accumulated during this 24 hour period? Answer-Change frequency schedule to 59.98 Hz If BA ABC's RT signal for power flow over ABC's midway tie-line with BA XYZ is significantly in error, the ABC system operator shall Answer-Adjust the control setting (e.g. substitute a value for the tie line power flow in the EMS) to compensate for the equipment error until repairs can be made The normal and recommended mode of AGC is what? Answer-Tie line frequency bias A 100 MW generator at 50 MW output has a 5% governor droop response will respond to how much of a -.15Hz frequency deviation (actual frequency 59.85 Hz) Answer-+5 MW Which of the following complies with the control performance standard Answer-CPS1=135% A system disturbance has caused your BA to lose tie line RTUs with a neighboring BA and all frequency meters which telemetered data into your EMS. How would you operate your GC system for this scenario? Answer-Place all generating units on manual control and try as best you can to match generation with load Each BA shall perform control error checks using tie-line MWh meters to determine the accuracy of its control equipment. How often do NERC reliability stands require each BA to perform these control error checks? Answer-Every hour Upon telemetry failure of a generators output, which of the following would you expect to change Answer-Actual load (as displayed in the Control Room) There is an inadvertent accumulation of 240 MWh over generation that should be used to schedule payback with neighboring control area. If 50% is on peak, which schedule will work? Answer-20 MW delivered hour ending 0100 through HE 1300 Monday (CST) Each BA shall operate such that its clock minute average of reporting ACE does not exceed its clock minute BA ACE limit (BAAL) for more than how many consecutive minutes? Answer-30 minutes Each frequency response sharing group or BA that is not a member of a Frequency Response Sharing group shall achieve an annual FRM Answer-That is equal to or more negative than its FRO to demonstrate compliance with requirement R1 Each BA that is a member of multiple BA interconnection and is not receiving overlap regulation service


Document information

Uploaded on
January 18, 2024
Number of pages
17
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$11.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
111
Followers
82
Items
2228
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.