Elevator FINAL EXAM 2024. wrench used for rail installation - ANSWER spud wrench The minimum clearance form the floor to the suspended ceiling is: a. 80" b. 96" c. 7'3" d. 8'2" - ANSWER a. 80" what should you be aware of when removing a cab for replacement? a. The weight that is to be removed from the ceiling. b. The original weight and counterbalancing. c. How much the cab was out of square. d. Cover the panels so they do not get banged up. - ANSWER b. The original weight and counterbalancing. When fans are used on modernization jobs for exhausting fumes, what statement is correct? a. They're to keep you cool, not for exhausting fumes. b. They should direct the fumes into the hoistway. c. They should direct the fumes into the pit. d. They should direct the fumes to the outside. - ANSWER d. They should direct the fumes to the outside. The star symbol is used on the COP for what? a. To show where the floor buttons are located. b. To designate the main floor. c. To make the door buttons stand out. d. To show the alarm bell location. - ANSWER b. To designate the main floor. Using a laminate stop strip against the fence on a table saw: a. Keeps the laminate straight to the blade. b. Keeps the laminate from lifting off the blade. c. Keeps the laminate from slipping under the fence. d. Keeps the laminate from going over the fence. - ANSWER c. Keeps the laminate from slipping under the fence. The contact adhesives must be ________ before final bonding: a. 85 degrees b. Dry c. Wet to touch d. Cold - ANSWER b. Dry

Content preview

Elevator FINAL EXAM 2024.
wrench used for rail installation - ANSWER spud wrench

The minimum clearance form the floor to the suspended ceiling is:
a. 80"
b. 96"
c. 7'3"
d. 8'2" - ANSWER a. 80"

what should you be aware of when removing a cab for replacement?
a. The weight that is to be removed from the ceiling.
b. The original weight and counterbalancing.
c. How much the cab was out of square.
d. Cover the panels so they do not get banged up. - ANSWER b. The original weight
and counterbalancing.

When fans are used on modernization jobs for exhausting fumes, what statement is
correct?
a. They're to keep you cool, not for exhausting fumes.
b. They should direct the fumes into the hoistway.
c. They should direct the fumes into the pit.
d. They should direct the fumes to the outside. - ANSWER d. They should direct the
fumes to the outside.

The star symbol is used on the COP for what?
a. To show where the floor buttons are located.
b. To designate the main floor.
c. To make the door buttons stand out.
d. To show the alarm bell location. - ANSWER b. To designate the main floor.

Using a laminate stop strip against the fence on a table saw:
a. Keeps the laminate straight to the blade.
b. Keeps the laminate from lifting off the blade.
c. Keeps the laminate from slipping under the fence.
d. Keeps the laminate from going over the fence. - ANSWER c. Keeps the laminate
from slipping under the fence.

The contact adhesives must be ________ before final bonding:
a. 85 degrees
b. Dry
c. Wet to touch
d. Cold - ANSWER b. Dry

,What is the most important piece of equipment you have when using a power saw?
a. Combination blade
b. Safety glasses
c. Wood rule
d. Framing square - ANSWER b. safety glasses

When using a circular saw, which of the following is correct?
a. Never start the cut until the blade is turning full RPM
b. The base is not adjustable for cutting depth
c. Circular saw blades range from 10 to 16 inches
d. Remove the retractable guard before cutting - ANSWER a. Never start the cut until
the blade is turning full RPM

What is used to make crosscuts on a table saw?
a. Push stick
b. Rip fence
c. Miter gauge
d. Larger Blade - ANSWER c. Miter saw

When making crosscuts with a radial arm saw which statement is correct?
a. Push the wood slowly into the blade.
b. Restrain the blade from moving too fast.
c. Rotate and lock the blade parallel to the guide.
d. Adjust the blade 1/4" above to cutting surface - ANSWER b. Restrain the blade from
moving too fast

What are the two things a compound mitre saw does best at the same time?
a. moving it around and setting it up is fast.
b. You can cut left and right at the same time.
c. Tilting the blade 45 degrees and pivoting the table 45 degrees gives you a 90 degree
square cut.
d. bevel and mitre cuts can be made at the same time - ANSWER d. bevel and mitre
cuts can be made at the same time

Why do we use laminated glass in the walls of glass elevator cabs?
a. if the glass breaks you can get a replacement at the hardware store.
b. if the glass cracks the plastic interlayer holds the fragments
c. it is made in a variety of colors
d. it is easy to handle and installs quickly - ANSWER b. if the glass cracks the plastic
interlayer holds the fragments

Which of the following is NOT a step in preparing the walls before hanging panels?
a. check walls for square and plumb
b. mount handrails on the walls where the panels will be installed.
c. clean surfaces and fill all holes not being used

, d. preheat walls as per specifications - ANSWER b. mount handrails on the walls where
the panels will be installed

When installing a resilient tile floor covering, there should be a layer of ________
between the underlayment and the tiles.
a. plywood
b. grout
c. 15lb asphalt paper
d. tile separators - ANSWER c. 15 lb asphalt paper

While similar to laying resilient floor tiles, ceramic tiles require the additional steps of:
a. grouting and sealing
b. stress testing and certification
c. glazing and firing
d. marking and cutting - ANSWER a. grouting and sealing

Once you are satisfied with the layout of the tiles after a dry layout, remove them and
a. stack them neatly in a location near the entrance
b. adhere adjoining tile edges so the floor pattern won't be lost
c. test each tile for durability
d. lay them out in an adjacent area to maintain the floor pattern correctly. - ANSWER
d.d lay them out in an adjacent area to maintain the floor pattern correctly

For carpet installation, if the cab area measures 94 inches by 62 inches and you need
an extra six inches added to each dimension to account for waste during cutting, how
many square yards of carpet do you need for this job?
a. 6.25
b. 6
c. 5.5
d. 5.25 - ANSWER d. 5.25

if suspended glass is used with lighting fixtures, the fixture must be
a. positioned in the center of the dropped ceiling
b. concealed behind a metal grid
c. supported by a metal frame and securely fastened by at least 3 points
d. flush with the surface of the ceiling - ANSWER c. supported by a metal frame and
securely fastened by at least 3 points

all cab modernization should be performed at what floor?
a. at the main lobby
b. bottom floor
c. top floor
d. lowest landing - ANSWER c. top floor

to meed A.D.A. requirements, hall call buttons are centered at ____ above the finished
floor.

Document information

Uploaded on
January 16, 2024
Number of pages
19
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$13.39

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Nursewendo
3.7
(22)
Sold
72
Followers
19
Items
4971
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions