• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

ICC / UST (With correct solutions)

Document preview thumbnail
Preview 1 out of 3 pages

Corrosion Specialist correct answers designs and certifies cathodic protection system Secondary containment shall be constructed to contain at least the following volumes: correct answers A. 100% of usable capacity of primary where there is only one primary is within the secondary B. 150% of the largest container if there are multiple primary containers in a single secondary Cathodic protection tester will test cathodic protection system within __ months of installation and every __ years thereafter correct answers 6 months 3 years Spill container shall meet the following requirements: correct answers A. If made of metal, exterior wall shall be protected from galvanic corrosion B. Shall have minimum capacity of 5 gallons (19 L) C. Shall have drain valve which allows drainage of the collected spill into the primary container or provide means to keep spill cont empty Overfill prevention shall alert transfer operator when tank is __% full correct answers 90% Flapper Valves shall provide positive shut off when tank is filled to no more than __% capacity correct answers 95% Primary pressurized piping shall be tested for tightness hydrostatically at __% of design operating pressure correct answers 150% Date that all UST systems must have Line Leak Detector installed correct answers November 9,2004 Secondary containment testing shall be done upon ____, __months, and every ___ months or ____ years thereafter correct answers Installation 6 months 36 months or 3 years Owners/ops shall submit SCT results to local agency within ____ days of completion correct answers 30 days All monitoring equipment shall be tested, calibrated, operated, maintained, and certified every ____ months. correct answers 12 months A person conducting UST monitoring equipment certification shall affix tag/sticker on each component and shall include ___ and ___. correct answers Date certified, replaced or repaired Contractor/tank tester's license number


Document information

Uploaded on
January 7, 2024
Number of pages
3
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$8.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProPerfomer
3.8
(84)
Sold
450
Followers
322
Items
8858
Last sold
1 week ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.