UST Dates and Frequency Questions and Answers(A+ Solution guide)
Secondary containment required for all new USTs (date) - January 1, 1984 (25291; H&SC) 23 CCR closure requirements do not apply to UST closed prior to ____________________ (date) - January 1, 1984 (2670(I); CCR) New UST with pressured piping must have secondary containment after __________________(date) - July 1, 1987 (25291; H&SC) Spill Containment required for all USTs (date) - December 22, 1998 (2665; CCR) Overfill protection required for all USTs (date) - December 22, 1998 (2665; CCR) Secondary Containment required for all non-motor vehicle fuel USTs (date) - December 22, 1998 (2662 (b); CCR) Striker Plates required (date) - December 22, 1998(2662; CCR) Single wall steel USTs required cathodic protection & lining or bladder (date) - December 22, 1998 (2662 (c); CCR) Shut down and fail safe LLDs required for single wall pressurized piping (date) - December 22, 1998 (2666 (c); CCR) Under Dispenser Containment (UDC) required for newly installed USTs (date) - January 1, 2000 (2636 (g); CCR) An individual installing UST components manufacturer's refresher training required (date) - July 1, 2001 (2715 (g)(1); CCR) Manufacturer's refresher training required for UST installers after (date) - July 1, 2001 (2715 (h); CCR) Under Dispenser Containment (UDC) required for all USTs (date) - December 31, 2003 (2636 (g)(C); CCR) Secondary Containment Testing for USTs installed prior to 1/1/2001 (date) - January 1, 2003(2637) Secondary Containment constructed to prevent any water intrusion (date) - July 1, 2003 (25290.2 (c); H&SC) Product tight means impervious to liquid and vapor of substance inside (date) - July 1, 2003 (25290.2 (a); H&SC)
Written for
- Institution
- UST Dates and Frequency
- Course
- UST Dates and Frequency
Document information
- Uploaded on
- January 6, 2024
- Number of pages
- 7
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Content preview
Also available in package deal