ENCE 325 Questions and Answers Rated A+
ENCE 325 Questions and Answers Rated A+ The widening of a state highway is an example of which sector of the construction industry? Infrastructure Specialty trade contractors are typically hired on the job by which of the following? The Contractor A construction project is characterized by the following? It is unique, It results in deliverables, and it uses resources In which of the following stages does the contractor have the major responsibility to coordinate all necessary tasks associated with that stage? Close Out Which member of the contractor's team is responsible for the day-to-day production activities on the jobsite? The Superintendent The residential sector of the industry is characterized by which of the following? Projects are fairly low tech What is the major rating system for green buildings LEED During the start-up and mobilization stage the following activities occur? The contractor moves onto the obsite The ______ is responsible for the project feasibility stage. owner The outcomes of the bidding and awards stage are ______ ,_______and ______. bid package, bid submittals, and awarding of contract. A design-build delivery method typically results in the owner having one contract with the architect and another contract with the contractor. False The owner will decide which of the following as a result of the feasibility stage (select all correct answers). Move forward with the contract, abandon the project, and Adjust the scope, budget and or schedule Project design typically occurs in three distinct phases _________,_____, and _______ schematic design , design development, final design An owner is considering building a 120 unit housing development on the outskirts of town. What would you refer to in determining if horses would be allowed as part of the property development? Zoning Ordinance Private owners may prefer to negotiate a fixed price with a contractor. In that situation, the delivery method is called ___________. Design negotiate build In an agency construction management (agency CM) delivery method, the CM is financially responsible and self-performs work. False For typical projects that are competitively bid, the process is fairly consistent and includes five key steps. Which of the following is NOT one these steps. Architect Reviews bid package There is a unique difference between open or closed projects during the bidding process. For most publicly funded projects, open bidding (or allowing any qualified contractor to bid) is the norm. True The primary technology enabler for the Integrated Project Delivery (IPD) method is _________. BIM The primary advantages of the Design-Bid-Build delivery method include which of the following (select all correct answers). Competively Bid, Known upfront cost, Most familiar to all parties Which of the following is not a type of surety bond in construction? Surety Bond Which of the following are considerations when developing a project construction estimate? (Select all correct answers) Location of the project, Market Conditions, Schedule and Timeframe Value Engineering is not the same as cost cutting. True An owner is interested in building a 50,000 square foot (SF) office building. He/She develops a cost estimate based on cost per SF using industry references such as RS Means. This is an example of which type of estimate. Preliminary Estimate Project costs are generally identified in two categories - direct and indirect. Direct costs include which of the following? (Select all correct answers) Labor, Materials, Equipment The Davis-Bacon Act is important in the estimating process to determine which of the following of the cost categories? Labor What are the primary ingredients of a contract? (Select all correct answers) Mutual Agreement, Capacity, Consideration, Lawfulness From an Owner's perspective, a cost plus fee contract is the riskiest of all the types of contracts. True One way to reduce Owner's risk is to have a cap on the contract cost of a project. This is an example of which type of contract? Cost Plus With a GMP According to Dykstra, what issues impact the choice of a contract? Projects, Delivery Method, Risk Allocation The key to mutual agreement is that all parties agree to exactly what is written in the contract documents. True The following is an example of which type of contract? A contractor bids a fixed unit price and at the completion of work is paid based on the actual quantities. Unit Price
Document information
- Uploaded on
- December 30, 2023
- Number of pages
- 6
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Unknown