PJM Test Questions with 100% Correct Answers
Tie-Line Bias - Which of the following balancing control modes is used by PJM under normal operations? Weather Conditions & Day of the Week - Which of the following influences does PJM consider when performing their system load forecast? Dynamic Instability - All of the following are limits that must be submitted to PJM for generating units EXCEPT: 1. Eco Min 2. Eco Max 3. Emergency Max 4. Dynamic Instability Synch Reserve - If PJM experienced an event that caused the loss of a 1,000 MW generator, which of the following would most likely provide the quickest impact to improve the undegenerating Area Control Area (ACE)? 1. Remedial Action Reserve 2. Synch Reserve 3. Non-Synch Reserve 4. Secondary Reserve
Document information
- Uploaded on
- December 21, 2023
- Number of pages
- 34
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers