NERC Practice Set 3 questions with correct answers
b. Perform power flow study in preparation of opening Line 1 CORRECT ANSWER Your system is experiencing heavy loading and low voltage . What is the first response for a System Operator ? a) Take lines out of service b) Put capacitors in service c) Put reactors in service d) Lower loads CORRECT ANSWER b) Put capacitors in service Which of the following action is appropriate for mitigating heavy power transfer on a transmission line ? a) Put parallel line in service b) Put a capacitor in service c) Put a reactor in service d) Increase generation CORRECT ANSWER a) Put parallel line in service Line A is a 100 mile 500kV transmission line. Line B is a 10 mile 500 kV transmission line. Both lines are lightly l
Written for
- Institution
- NERC
- Course
- NERC
Document information
- Uploaded on
- December 8, 2023
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
nerc practice set 3 questions with correct answers
Also available in package deal