• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

CH 09 - Project Scheduling: PERT/CPM

Document preview thumbnail
Preview 4 out of 33 pages

CH 09 - Project Scheduling: PERT/CPM © Cengage. Testing Powered by Cognero. Page 1 True / False 1. It is normal for activities on the critical path to be delayed without delaying the entire project. a. True b. False ANSWER: False POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times KEYWORDS: Bloom's: Remember 2. PERT and CPM are applicable only when there is no dependence among activities. a. True b. False ANSWER: False POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times KEYWORDS: Bloom's: Remember 3. A path through a project network must reach every node. a. True b. False ANSWER: False POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times KEYWORDS: Bloom's: Understand 4. A critical activity can be part of a noncritical path. a. True b. False ANSWER: True POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times CH 09 - Project Scheduling: PERT/CPM © Cengage. Testing Powered by Cognero. Page 2 KEYWORDS: Bloom's: Understand 5. When activity times are uncertain, an activity's most likely time is the same as its expected time. a. True b. False ANSWER: False POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.02 - 9.2 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.2 Project Scheduling Considering Uncertain Activity Times KEYWORDS: Bloom's: Understand 6. The final activity's earliest finish time is the anticipated project duration. a. True b. False ANSWER: True POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times KEYWORDS: Bloom's: Understand 7. The length of time an activity can be delayed without affecting the project completion time is the slack. a. True b. False ANSWER: True POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.01 - 9.1 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking TOPICS: 9.1 Project Scheduling Based on Expected Activity Times KEYWORDS: Bloom's: Remember 8. When activity times are uncertain, total project time is normally distributed by considering the overall mean being equal to the sum of the means of all of the critical activities. a. True b. False ANSWER: True POINTS: 1 DIFFICULTY: Easy LEARNING OBJECTIVES: IMS.ASWC.19.09.02 - 9.2 NATIONAL STANDARDS: United States - BUSPROG: Reflective Thinking


Document information

Uploaded on
November 29, 2023
Number of pages
33
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QuizGuider82
3.6
(19)
Sold
110
Followers
92
Items
2477
Last sold
6 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.