100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.2 TrustPilot
logo-home
Exam (elaborations)

2023 CLC 056 /CLC 056 Analyzing Contract Costs Exam QUESTIONS AND ANSWERS GRADED A

Rating
-
Sold
-
Pages
8
Grade
A+
Uploaded on
20-11-2023
Written in
2023/2024

1. Identify the circumstances when cost analysis should be performed by answering the following question: “Unless an exception to certified cost or pricing data applies, you can perform cost analysis on which of the following procurements? a. All of these are correct b. The award of a subcontract at any tier, if the contractor and each higher-tier subcontractor have been required to furnish certified cost or pricing data. c. The modification of any sealed bid or negotiated contract d. The award of any negotiated contract (except for undefinitized actions such as letter contracts. 2. What is the best method for determining an improvement curve slope? a. Using the median percentage from similar products b. Using established slopes from the Cost Estimator’s Reference Manual c. Using actual historical data d. Using averages derived from recent procurements 3. Each Price Negotiation Memorandum must contain which one of the following?a. Statement that the price is fair and reasonable b. Signature of the Contract Specialist c. Signature of the Legal Counsel d. Statement that the FAR was consistently followed. 4. Which sampling technique is used to focus on high-value items? a. Random b. Stratified c. Cluster d. Nonprobability 5. Which of the following type of costs would most likely be categorized as both direct costs and indirect costs, depending on the circumstance? a. G&A Overhead b. Utilities c. Direct Material d. Travel Expense 6. Using a direct comparison with the cost of a similar contract effort is an acceptable summary estimating technique. a. True b. False 7. Identify when cost analysis would be required. a. For all proposals exceeding the micro purchase threshold b. Whenever a price proposal is received c. When certified cost or pricing data are required d. To evaluate profit or fee 8. What two costs elements are required to calculate an indirect cost rate?a. Expense pool and Allocation base b. Overhead rate and Expense base c. Allocation Pool and Expense base d. Allocation base and Overhead rate 9. In reviewing the proposal for the robotic surveillance vehicle you asked for clarification on the travel cost listed as an ODC. Which response would justify travel as an ODC? a. The travel costs are for the project manager and the manufacturing supervisor to deliver the prototypeto the Government testing site for final demonstration testing. b. The travel costs are for several senior engineers to attend a conference on the latest development in manufacturing. c. The travel costs are for the corporate vice president to attend the annual robotic association meeting. d. The travel costs are for warehouse personnel to attend OSHA training on how to safely handle hazardous materials. 10. Which of the following is an indirect cost pool? a. Manufacturing labor b. Assembly labor c. General and Administrative Expenses d. Direct material 11. What is Certified Cost or Pricing Data subsequently found to have been inaccurate, incomplete, or noncurrent known as? a. Defective Pricing b. Data other than cost or pricing data c. Exception to certified cost or pricing data d. CICA Violation 12. How is simple linear regression used? a. To make predictions about one dependent variable based on one independent variable b. To make predictions about one dependent variable based on more than one independent variable. c. To calculate an estimate that demonstrates the most likely average value based on the data supplied d. To ensure contractor’s estimates properly capture the reduction of labor costs associated with repetitive production tasks. 13. What is the “base” that used in the calculation of the performance rick, contract type rick, and cost efficiency factor when using the weighted guidelines to determine a profit/fee objective? a. Indirect costs b. Total price c. Direct costs d. Total costs 14. What is an important driver to a successful negotiation? a. Obtain the lowest price for the government b. Ensure your position os heard c. Maintain position of power d. Listen to understand 15. How may you request an audit? a. By mail b. By email c. By telephone call d. All of these are correct 16. Which of the following would be a proper method of determining the reasonableness of a contractor’s proposed labor hour estimate? a. Request that the contractor provide a should-cost-estimate b. Decrement labor hours estimate according to DCAA standard decrement c. Compare proposed hours on all other contracts from the same contractord. Compare proposed hours with a government should-cost estimate 17. Identify the correct definition of “Cost Realism Analysis” a. The process of examining and evaluating a proposal to ensure all elements of cost are in line with the Independent Government Estimate b. The review and evaluation of individual cost elements, excluding profit, in a proposal. c. The process of independently reviewing and evaluating specific elements of cost, in part to determine whether they reflect a clear understanding of the requirement. d. The review of a proposal to ensure the contractor has properly documented adherence to their approved estimating system guidelines 18. Select the item below that would likely be categorized as a Direct Material Cost a. Extra material or items that are left over from the contract and cannot be used b. The purchase of 104 motor assemblies needed to manufacture vehicles c. Washers and seals used in the assembly process for all of the manufacturer’s products d. Rail transportation used to get the materials to the offeror’s facility 19. When given a set of data that appears to contain outliers, which measure of central tendency is most appropriate to use? a. Mean b. Mode c. Coefficient of Determination d. Median 20. The cost accounting systems that are used by a contractor manufacturing a number of identical units for multiple customers are: a. Process Cost System b. Generally Accepted Accounting Practice c. Job Order Accounting d. Cost Accounting Standards 21. A cost is allowable if it is: a. Established, disclosed and allocated b. Reasonable, allocable and compliant with CAS/GAAP c. Consistent, uniform and reasonable d. According to the terms and conditions of the contract, compliant with CAS/GAAP and certified to be accurate, current and complete 22. When is it most appropriate to document or model a contractor’s proposal? a. Whenever there are values in excess of $1 million included in the proposal b. When analyzing multiple commercial supply proposals c. When the value, importance and complexity warrant the modeling d. Anytime you award a competitive contract 23. When calculating the confidence interval, the sample standard deviation is used to derive the standard error of the mean a. True b. False 24. The purpose of an audit is to: a. Verify the transaction legality b. Determine the degree of compliance with established procedures c. Determine if the data is accurate and complete d. All of these are correct 25. Which variable is also considered the independent variable? a. X b. Y c. R d. Z 26. When material prices may vary significantly from current inventory values, which estimating method should be used? a. Government User Estimates b. Historical Quotes c. Long Term Agreement Pricing d. Current Supplier Quotes 27. When is the working capital adjustment used while calculating profit/fee? a. On all fixed price contracts with financing b. On all fixed price contracts c. On all cost reimbursement contracts d. On all fixed price contracts with progress payments 28. Which of the following factors is critical to a successful negotiation?a. Effectively prepare, plan and communicate b. Avoid being too friendly, in case the negotiations get difficult c. The negotiation should be competitive d. Set your opening position extremely low to give room to negotiate 29. Which of the following situations would the use of improvement curve analysis likely be used in evaluating proposed costs? a. Assembly line repair of a turret assembly for an M1/M2 Abrams tank b. Assembly of two new prototype aerial refueling airplanes c. Fabrication of a single jet engine frame assembly d. Fabrication of a new aircraft carrier 30. What is the negotiation term that reflects each party emphasizing the long term effects and benefits as well as both parties defining their interests to be achieved in conjunction with the outcome? a. Win-Lose b. Win-Lose-Win c. Win-Win d. Lose-Lose 31. “Direct labor positions” share the same titles and pay levels. a. True b. False 32. A contractor submits a cost proposal and includes support that its proposed costs are what it would actually incur during contract performance. In this case, the Government contracting officer is required to consider the proposed costs as reasonable. a. True b. False 33. A contractor incurs costs for raw materials to be used in two different government contracts. Is the value of this raw material allocable to one contract? a. No, raw material is always charged as an overhead expense b. Yes, because all the material is to be used for government contracts c. No, material must be used and charged specifically to the benefiting contract d. Yes, due to the efficiency gained by procuring all the material at one time. 34. The statutory authority for requiring certified cost or pricing data relies primarily on Department of Defense contract policy a. True b. False 35. A contractor estimates labor rates using weighted averages. As a contracting officer, you are NOT required to consider any labor-management agreement when developing your labor rate objective. a. True b. False 36. When is the most appropriate to document or model a contractor’s proposal? a. Whenever there are values in excess of $1 million included in the proposal b. Anytime you award a competitive contract c. When analyzing multiple commercial supply proposals d. When the value, importance, and complexity warrant the modeling 37. Who has the authority to waive CAS applicability for a particular contract?a. The Agency Head b. Agency Lead Counsel c. The Contracting Officer’s Representative d. A level above the contracting officer 38. You are preparing to negotiate a service task

Show more Read less
Institution
2023 CLC 056 /CLC 056 Analyzing Contract Costs Exa
Course
2023 CLC 056 /CLC 056 Analyzing Contract Costs Exa









Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
2023 CLC 056 /CLC 056 Analyzing Contract Costs Exa
Course
2023 CLC 056 /CLC 056 Analyzing Contract Costs Exa

Document information

Uploaded on
November 20, 2023
Number of pages
8
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

  • 2023 clc 056 clc 056

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
DOCSTUVIA Chamberlain College Nursing
View profile
Follow You need to be logged in order to follow users or courses
Sold
31
Member since
2 year
Number of followers
13
Documents
860
Last sold
4 weeks ago
BEST SELLER DOCSTUVIA WITH LATEST EXAM ELABORATIONS ,TESTBANKS ,ASSINGMENTS, I HUMANS AND CASE STUDIES

BEST SELLER DOCSTUVIA WITH LATEST EXAM ELABORATIONS , TESTBANKS ,ASSINGMENTS, I HUMANS AND CASE STUDIES HOMEWORK HELP AND TUTORING ,ALL KIND OF QUIZ AND EXAMS WITH GUARANTEE OF A+ Am an expert on major courses especially; psychology, Nursing, Human resource Management and Mathemtics Assisting students with quality work is my first priority. I ensure scholarly standards in my documents and that's why i'm one of the BEST TUTOR

3.9

10 reviews

5
6
4
1
3
1
2
0
1
2

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions