• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Judgments

Construction_Technology_2.

Document preview thumbnail
Preview 1 out of 2 pages

Construction_Technology_2.

Content preview

All Rights Reserved


TERTIARY AND VOCATIONAL EDUCATION COMMISSION

COMMON WRITTEN EXAMINATION – 2021/ 2022


Diploma in Quantity Surveying

NVQ Level 05 –Semester I `

Construction Technology 1 F45C002M03 Three Hours


Answer any five (5) questions only
.
1. i) The basement excavation of a high-rise building is 2-3m deep and excavation has to be
commenced soon.
a) What are the main activities to be performed to accomplish the excavation work?
(04 marks)
b) Name the resources required for each of them. (04 marks)
c) What are the challenges you may face while executing excavation? (04 marks)
ii) Staircase is a mode of connection of two different elevations and to move safely. Draw a
sketch of one (01) type of it and name the parts. (08 marks)

2. i) Concreting of a floor slab is planned and it is the responsibility of the technical staff to
ensure the quality of the end product.
a) Briefly explain the list of activities/ items that should be checked, a day before
concreting; (06 marks)
b) What are the actions you should take to ensure the quality when the concreting is
progressing? (04 marks)
ii) Draw a sketch of English bond and Flemish bond of the right angle corner of the 225mm
thick wall. (10 marks)

3. Multi story construction project with underground car park has been decided to construct in
Malabe. Soil investigation report indicates that the soil condition is very weak and distance
to the bedrock is too far. Design team discussed about the pad foundation, raft foundation &
pile foundation.
a) Name most suitable foundation type for this location and briefly explain why do you select
this type of foundation (05 marks)
b) Name most suitable retaining wall for this project and briefly explain, why do you select
this type of retaining wall (05 marks)
ii) a) State two types of pile foundations made in constructions (02 Marks)
b) Earth can be retained by itself. How to retain it (03 Marks)
c) What is the difference between hand mixing concrete and machine mixing concrete?
(02 Marks)
d) Name three earth retaining structures (03 Marks)

Document information

Uploaded on
November 1, 2023
Number of pages
2
Written in
2023/2024
Type
Judgments
$7.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Studyabroad
3.7
(3)
Sold
73
Followers
29
Items
1989
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions