Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

F60 Fireguard test study guide 2023

Document preview thumbnail
Preview 1 out of 2 pages

For hot work operation with citywide permit, the owner of the premises of the hot work operation areas must be notified in writing by the citywide permit holder ______ the hot work is to be started. - at least 48 hours before The pre-hot work check must be conducted by the responsible person before hot work is authorized and __________ - least once per day. The check reports must be kept at the work site during the work, made available for inspection by a representative of the FDNY, and maintained on the premises for a minimum of - 48 hours after work is complete. A pre-hot work check must be conducted at least - once per day Hot work operations involving cutting or welding shall be conducted at least - 35 feet from combustible materials and combustible waste All other hot work operations shall be conducted at least - 25 feet from combustible materials and combustible waste Sprinkler system protection ____________while hot work is performed. - must not be shut off or impaired When should a Fire watch be maintained - A fire watch must be maintained during any hot work operation. What other duties should the Fire Watch have while on hot water operations. - The persons conducting a fire watch shall not have other duties. Where hose lines are required, they shall be connected, charged and ready for operation - At least one portable fire extinguisher with a minimum 2-A:20-B:C How far away should one fire extinguisher be from any operation - 30 feet The fire watch for torch operations conducted at the following three locations shall be conducted by at least one F-60 fire guard - (1)Construction sites. (2)In any building or structure, when the torch operation is conducted by a person holding a citywide permit for torch operations. (3)On any rooftop, or in connection with any torch-applied roofing system operation. e not less than one multi-purpose portable fire extinguisher with a minimum ______________ for roofing operations utilizing heat-producing systems or other ignition sources. - 3-A 40-B:C


Document information

Uploaded on
October 10, 2023
Number of pages
2
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Bestzone
3.9
(27)
Sold
186
Followers
111
Items
5003
Last sold
2 months ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.