California UST Service Technician part 1 QUESTIONS AND CORRECT ANSWERS
California UST Service Technician part 1 QUESTIONS AND CORRECT ANSWERS July 1 2005, service techs shall possess or work under someone who has a current certification indicating he or she has passed the ? - ANSWER California UST service technician exam ICC cert must be renewed every? - ANSWER 24 months Service techs must posses or be employed by a person who has the appropriate contractors license unless? - ANSWER The individual has a Tank testing licens Service tech is defined by any individual who? - ANSWER Test UST monitoring equipment Trouble shoots UST systems Installs UST monitoring equipment If the manufacturer training no longer exist , the local angency may? - ANSWER Approve comparable alternat training . UST includes? - ANSWER Tank and connected piping What is considered and UST - ANSWER petroleum storage tank What UST system meets the requirements for secondary containment? - ANSWER Doubled wall tanks According to title 23; the following piping components if installed after July 1 1987 must have secondary containment - ANSWER Pressured product piping Considered "pipe" on tanks installed after July 1 2003 - ANSWER Pressured product piping and below ground vapor recovery Under dispenser containment (UDC) was required for all UST systems by - ANSWER December 31 2003 System for exchanging gas vapors in a storage tank and product in a fuel delivery truck - ANSWER Stage 1 vapor recovery An approved method for non visual monitoring for existing UST systems. - ANSWER Statistical Inventory Reconciliation (SIR) ATG must be capable for detecting a release of ? - ANSWER .2 gallons per hour Manual inventory reconciliation. - ANSWER No longer an approved method for non visual monitoring on existing UST systems Automatic line leak detectors installed on underground piping with secondary containment shall be capable of tetecting a leak of ? - ANSWER 3 gallons per hour at 10 psi ATG should be programmed to test the tank ? - ANSWER At least monthly According to PEI RP 300 a combustible gas can be used to ? - ANSWER Detect vapor leaks in a vapor recovery system. According to PEI RP 300. A written scope of work for vapor recovery installation should include? - ANSWER Construction plans Positive shut off overfill protection device must stop the flow of fuel when the tank is no more then ? - ANSWER 95% full According to EO VR 201 A What could cause a nozzle shut off mechanism or malfunction? - ANSWER Depended filter seal damage
Document information
- Uploaded on
- September 25, 2023
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers