USATCES has submitted your ESSP for final approval. Who did they submit to? - Correct Answer- DDESB What is the minimum distance permitted between an A&E location and the installation headquarters building? - Correct Answer- Inhabited Building Distance (IBD) What is the minimum distance permitted between a PES and an interstate highway? - Correct Answer- Public Traffic Route Distance (PTRD) What is the minimum distance permitted between any two operating buildings and sites within an operating line? - Correct Answer- Intraline Distance (ILD) What is the minimum distance permitted between an earth-covered magazine and a nearby above-ground magazine? - Correct Answer- Intermagazine Distance (IMD) What do you call the collection of documents that identifies the relationship between a PES and any facilities or personnel who may be exposed to the PES? - Correct AnswerESSP Your installation is putting a new roof on an existing PES facility. Do you need to complete an ESSP? - Correct Answer- No, this type of change does not require one Your installation is changing the NEW of an existing facility and will be storing a hazard division not previously approved in it. Do you need to complete an ESSP? - Correct Answer- Yes, and it must be approved by the DDESB Which of the following is a phase of the ESSP process? - Correct Answer- Development and Evaluation How many ESSP categories are there? - Correct Answer- Five how must the ESSP package be submitted? - Correct Answer- Electronically Which three items are in the Maps and Drawings section of an ESSP package? - Correct Answer- Facilities maps Installation maps Site maps Which three items are included in the Evaluations section of an ESSP package? - Correct Answer- Electrical installation
Document information
- Uploaded on
- September 25, 2023
- Number of pages
- 3
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers