Explosive Safety Site Planning 2023 With 100% correct solutions
ESQD arc - CORRECT ANSWER- PES IMD ILD PTRD IBD USATCES has submitted your ESSP for final approval. Who did they submit it to? - CORRECT ANSWER- DDESB What is the minimum distance permitted between an ammunition or explosives location and the installation headquarters building? - CORRECT ANSWER- IBD What is the minimum distance permitted between a PES and an interstate highway? - CORRECT ANSWER- PTRD What is the minimum distance permitted between any two operating buildings and sites within an operating line? - CORRECT ANSWER- ILD What is the minimum distance permitted between an earth-covered magazine and a nearby above-ground magazine? - CORRECT ANSWER- IMD what requires DDESB approval? - CORRECT ANSWER- New PES ES within an existing ESQD arc physical mod to PES increasing the NEW ESSP doesn't exist for PES what doesn't require DDESB - CORRECT ANSWER- HD 1.4, group S ops less than 30 days 50lbs of HD 1.2.2 100lbs of HD 1.3 unlimited HD 1.4 policy older than 1958 no PES or ES built
Document information
- Uploaded on
- September 23, 2023
- Number of pages
- 4
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers