• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 33 pages
Exam (elaborations)

ISA Utility Specialist (Chapters 1-7) Exam with Complete Solutions

Document preview thumbnail
Preview 4 out of 33 pages

In the U.S., enforcement of safety work rules resides with: - ANSWER-Occupational Safety & Health Administration (OSHA) Utility pruning is the pruning of trees located in the vicinity of power lines for the purpose of __________ __________ __________. - ANSWER-ensuring reliable service A comprehensive vegetation management program should be __________ rather than reactive, & based on principals of __________ vegetation management. - ANSWER-proactive; integrated What is a volt? - ANSWER-a unit of electrical force Major storms or __________ weather events are the usual cause of power outages over large areas. - ANSWER-catastrophic Without __________, messages can have multiple meanings. - ANSWER-context ISA BMPs provide a practical guide for implementing __________ __________. - ANSWER-industry standards Electrical resistance determines how much __________ is required to move electricity along a conductor and is measured in __________. - ANSWER-energy; ohms When communicating, a person's experience & __________ will influence how the person reacts. - ANSWER-perceptions Crew mobilization for a storm event is much more rapid from a __________ status. - ANSWER-standby NERC standards are specific to what line voltages? - ANSWER-200 kV & above An important first step in any vegetation management program should be to asses system conditions, which is often done through an __________. - ANSWER-inventory Which type of cuts are less unacceptable? - ANSWER-internodal cuts (e.g. topping) A worker neglecting to wear cut-resistant chaps while operating a chainsaw is committing an unsafe __________, while an employer failing to provide chaps is creating an unsafe __________. - ANSWER-act; condition A conductor carrying more than __________ volts would be considered a NERC line. - ANSWER-200,000 Communication is both verbal & nonverbal. When a customer is confronted with contradictory information, the person will usually believe the __________ message. - ANSWER-nonverbal Voluntary safety standards for pruning, trimming, repairing, maintaining & removing trees, & cutting brush: - ANSWER-ANSI Z133 NERC standards require the reporting of all tree caused outages by __________ categories - ANSWER-three A traditional cycle will schedule maintenance __________ trees grow into conductors. - ANSWER-before Which type of cuts are more acceptable? - ANSWER-nodal cuts (e.g. drop-crotch, thinning) The __________-__________ rule suggests that workers should take time before starting a job to check for potentially unsafe conditions & discuss them. - ANSWER-two-minute According to ANSI Z133, the minimum approach distance for persons other than qualified line-clearance arborists for 50 kV & less is __________. - ANSWER-10 feet Trees growing into contact with a single-phase distribution conductor pose __________ threat of a tree-ground fault. - ANSWER-little Where should the final cut be made for proper utility pruning? - ANSWER-just outside of the branch bark ridge and the branch collar A vegetation management scheduling unit may be an entire __________ or a __________ __________. - ANSWER-circuit; geographical area 2 examples of protective equipment: - ANSWER-circuit breakers lightning receptors On a storm site, cutting should not begin until all risks have been assessed & the __________ approach has been decided & adopted. - ANSWER-safest


Document information

Uploaded on
September 16, 2023
Number of pages
33
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
LUCKYSTAR2022
3.5
(163)
Sold
927
Followers
726
Items
9656
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.