SWPPP study guide Questions With Complete Solutions
Clean Water Act correct answer: Law set into place in 1970 for storm water regulation NPDES correct answer: Regulations for monitoring storm water activity on a construction site, are outlined in Immediately after project is awarded and before you begin any site work correct answer: When should you read and understand SWPP Contaminated ground water correct answer: What is not an allowable storm water discharge or non-storm water discharge When jurisdiction of operations specifies you can start correct answer: When may construction activity begin 303D list correct answer: Waters that fail anti-degradation list are placed on which list. An officer and project owner correct answer: SWPPPs certification are signed by who FALSE correct answer: The document that must be completed signed and submitted to the state to obtain authorization to discharge is the NOT. (T/F) All construction has been completed both inside and outside correct answer: NOT can be filed when is in charge of daily activities correct answer: Operations on a construction site are the entity in charge of plans and specification and the entity who? Stay out of trouble with the law correct answer: Motives for staying in compliance with storm water objectives? To protect and preserve beneficial use of U.S. waters, maintaining their clean, physical and biological integrit
Written for
- Institution
- SWPPP
- Course
- SWPPP
Document information
- Uploaded on
- September 5, 2023
- Number of pages
- 15
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
swppp study guide questions with complete solution
Also available in package deal