CESSWI- Sections 1 + 2 Questions With Complete Solutions
Qualified Personnel correct answer: a person knowledgeable in the principles and practice of erosion and sediment controls who possesses the skills to assess conditions at the construction site that could impact storm water quality and to assess the effectiveness of any sediment and erosion control measures selected to control the quality of storm water discharges from the construction acitivities How must the inspector act? correct answer: professional, impartial, courteous, consistent in every situation, honest and accurate with your response Why was the CWA enacted? correct answer: To restore and maintain the chemical, physical and biological integrity of the waters of the U.S. Section 401 correct answer: If you are involved in construction or industrial activities that may result in discharge of any pollutant you must obtain Water Quality Certification NPDES correct answer: National Pollutant Discharge Elimination System, est. 1972 Section 402 correct answer: Stated that five categories of strormwater discharges were subjected to permitting Phase I facilities correct answer: 1987 -those already covered under NPDES -those that engage in industrial activity -large (250,000) municipal separate storm drain system -medium (100,000, 250,000) municipal separate storm drain system -facilities that EPA determines to have stormwater discharges contributing to violation of water quality When did IGP and CGP roll out? correct answer: 1992
Document information
- Uploaded on
- September 4, 2023
- Number of pages
- 8
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers