Additional NERC Test Questions (COMPLETE SOLUTION)
1. Balancing Authority A is importing MW and has a tie-Iine flowing into them when the meter fails to zero. Which of the following statements is true? A) The Balancing Authority's frequency will drop B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will increase D) The Balancing Authority's ACE reading will decrease correct answers B) The Balancing Authority's generators on AGC will decrease output 2. Balancing Authority A has tie-line meter fail to zero on a line that is exporting 200 MWs. Which of the following statements is true? A) The Balancing Authority's total demand indication will increase B) The Balancing Authority's generators on AGC will decrease output C) The Balancing Authority's frequency will decrease D) The Balancing Authority's ACE reading will increase correct answers A) The Balancing Authority's total demand indication will increase 3. How does a System Operator realize the power system is getting close to the end of its available reactive resources? A) The voltage is increasing B) The rate of decrease/increase of the voltage does not relate to change in the load C) The rate of increase of the voltage decreases with the load D) The rate of decrease of the voltage increases with the load correct answers D) The rate of decrease of the voltage increases with the load 4. Which of the following indications would result from a significant loss of generation on an external BA? A) your ACE goes up and frequency stays the same B) your ACE stays the same and frequency increases
Document information
- Uploaded on
- September 4, 2023
- Number of pages
- 21
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers