NCCCO signal person test (with Complete Solutions)
continuously correct answers during all crane movements, asme b30.5 states that communication shall be maintained stop crane movements correct answers if the communication is disrupted at any time while the crane is operation, the operator shall osha 1926.1400 appendix a correct answers OSHA's standard method crane hand signals would be located in the following designated person correct answers according to asme b30.5 prior to qualifying all signal persons they must be tested by? none correct answers what should be the response of the operator if the signal is not understood posted conspicuously correct answers according to asme b30.5 where must a hand signal chart be posted lift director, signalman and operator correct answers when using voice signals according to asme b30.5 who must be present for the pre lift discussion limitations correct answers a qualified signal person must have knowledge of the standard hand and voice signals along with a basic understanding of crane operations and tested correct answers according to osha 1926.1419 before lifting operations begin communication systems shall be identify each other correct answers prior to commencing a crane lift the operator and signalperson shall perspective correct answers any direction given to the crane operator by the signal person shall be given from the operator function and direction correct answers what is the first element of voice signals given to a crane operator prior to the lift three correct answers according to osha and asme b30.5 each series of voice signals contain how many elements lift director correct answers for lifting operations using voice signals who has the responsibility of permitting multiple simultaneous crane functions standard signals correct answers according to asme b30.5 special signals cannot conflict with
Document information
- Uploaded on
- September 3, 2023
- Number of pages
- 5
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers