• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

NCCCO PREP (with Complete Solutions)

Document preview thumbnail
Preview 2 out of 7 pages

To provide protection in the cranes work area, barriers MUST be erected in accessible areas; correct answers Within the equipment's rotating structure All of the following can cause a two-block condition except: correct answers Raising the boom When rotation of load may be hazardous, the operator must correct answers Ensure tag line is used According to OSHA 1926 Subpart cc, which of the following individuals is not allowed within the fall zone? correct answers Qualified evaluator The term that is used to define the load plus all rigging components, hooks, blocks and lifting equipment is: correct answers Gross load According to OSHA 1926 Subpart CC, the minimum distance that must be maintained between a working crane, load or load line and an 8kV power line is: correct answers 10ft What is the sum of the following deductions? Block 1250lbs, Rigging 23lbs, Spreader beam 350lbs correct answers 1623lbs When a crane is set up to close to a new building, expect the ground to be: correct answers Soft A vertical basket hitch is rated at what percentage of a vertical hitch? correct answers 200% When is the hoist line on top of the boom considered part of the load? correct answers It is not considered When a heavy load is lifted, what is the result? correct answers Boom deflection According to OSHA 1926 Subpart CC, for cranes traveling with no load, what is the minimum clearance for energized power lines at 40kV? correct answers 6ft Wich of the following rigging configurations is listed in order of the strongest to weakest? correct answers Basket, Vertical, Choker According to OSHA 1926 Subpart CC, how many randomly distributed broken wires in rotation resistant wire rope are cause for replacement? correct answers 2 broken wires in 6 rope diameters What site conditions must an operator be concerned about prior to setting up a crane? correct answers Soil stability must be sufficient The best way to determine the weight of load to be lifted is to: correct answers Have certified load weight and add in the weight of all the rigging


Document information

Uploaded on
September 3, 2023
Number of pages
7
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
810
Followers
438
Items
40067
Last sold
5 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.