100% satisfaction guarantee Immediately available after payment Both online and in PDF No strings attached 4.6 TrustPilot
logo-home
Exam (elaborations)

Power Engineering 4B Book 4 Boiler Plant operation | 112 Questions with 100 % correct answers | Verified

Rating
-
Sold
-
Pages
29
Grade
A+
Uploaded on
12-08-2023
Written in
2023/2024

d - The most important rule in safe operation of a steam boiler is to a) keep the heat transfer surfaces clean b) maintain the boiler room log c) try to keep make up water to a minimum d) keep water in the boiler at the proper level c - in a multiple boiler high pressure steam plant , when starting an entire system from cold a) all boilers are started and warmed at the same time b) boilers remaining off-line must have their boiler and header stop valves open, and their non-return drain valves shut c) the entire system warms and pressurizes as one boiler warms, except for the boilers remaining off-line d) a small auxiliary heating boiler is used to warm the steam lines while the power boilers are warming d - deaerators often have low level alarms and low-low level trips a) in case of boiler trips b) in case the boiler feed water valve fails open c) in case the boiler feed water pumps trip d) in case the condensate transfer pumps trip c - boilers should be warmed up a) with maximum combustion air , to prevent smokingb) rapidly, so the metal heats up faster c) slowly, to minimize differential expansion and thermal shock d) using only the pilot burner c - Before performing a try lever test on a power boiler, what pressure should the boiler be at a) the boiler MAWP b) the set pressure of the safety valve c) at least 75% of the set pressure of the safety valve d)at or above 750kPa c - when closing up a boiler a) handhole and manhole gaskets must be coated with a sealant, such as graphite paste or silicone b) handhole and manhole gaskets should be reused , because they are expensive c) new handhole and manhole gaskets must be used, to prevent major blowouts and costly unplanned boiler outages d) handhole and manhole yolks must be torqued until the gaskets are compressed to less than 1mm thick d - On a semi-automatic ignition system, the switch on the supervised cock

Show more Read less
Institution
Power Engineering 4B Book 4 Boiler Plant Operation
Course
Power Engineering 4B Book 4 Boiler Plant operation










Whoops! We can’t load your doc right now. Try again or contact support.

Written for

Institution
Power Engineering 4B Book 4 Boiler Plant operation
Course
Power Engineering 4B Book 4 Boiler Plant operation

Document information

Uploaded on
August 12, 2023
Number of pages
29
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Brainarium Delaware State University
View profile
Follow You need to be logged in order to follow users or courses
Sold
1839
Member since
2 year
Number of followers
1043
Documents
22422
Last sold
2 hours ago

3.8

320 reviews

5
148
4
61
3
54
2
16
1
41

Recently viewed by you

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Frequently asked questions