Wastewater Exam Class C | Questions With Complete Solutions.
The Activated Sludge Process: A. requires preaeration B. requires Activated Carbon C. is an aerobic biological process. D. Usually precedes primary sedimentation. E. Requires 50% by volume old sludge to work effectively. - C. Is an Aerobic biological process A complete mix activated sludge plant has a fast settling sludge and high amounts of pin floc leaving the clarifier. One way to correct this problem is to : A. Increase the RAS Flow B. Reduce Wasting Rates C. Increase dissolved oxygen levels. D. Increase the F/M ratio by wasting more E. Increase the sludge age by wasting less. - D. Increase the F/M Ratio by Wasting More Which of the following flow rates should be measured if the operator is to control plant properly? A. Aeration rate or resulting dissolved oxygen level. B. Influent or effluent. C. return sludge D. waste sludge E. all the above - E. all the above During start up your aeration tank produces excessive amounts of billowing white foam. This can be corrected by:A. Doing nothing, it will go away in a few hours B. Increasing the sludge wasting rate C. Seeding the process with sufficient good quality sludge D. Spraying water on the foam until it is gone E. Taking a weeks vacation - C. Seeding the process with sufficient good quality sludge
Written for
- Institution
- Wastewater Class C
- Course
- Wastewater Class C
Document information
- Uploaded on
- August 12, 2023
- Number of pages
- 13
- Written in
- 2023/2024
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
Also available in package deal