Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 13 pages
Exam (elaborations)

LEED Green Associate Exam Practice Questions With Answers | Latest Update 2023/2024 | 100% Verified

Document preview thumbnail
Preview 2 out of 13 pages

For existing buildings, project teams carry out some important responsibilities. For existing buildings, which plan that the project teams must complete? A. A CFC PHASE-OUT PLAN B. WORK DISTRIBUTION PLAN C. SITE SELECTION D. DESIGNING PLAN LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 E. FULFILL THE REQUIREMENTS - correct answers A. A CFC PHASE-OUT PLAN Building analyzing software tools take inputs and determine the energy behavior of a building¡¯s systems over time. What is another feature of the software weather data that can be input into the software? A. AVAILABILITY OF REAL-TIME B. MAXIMUM TIME C. AVAILABILITY OF CONSECUTIVE TIME D. MINIMUM TIME E. AVAILABILITY OF IDLE TIME - correct answers A. AVAILABILITY OF REALTIME Which are the reasons of underperforming the building systems? - correct answers Building systems can underperform for several reasons: (1)The building was not properly configured, (2)The design did not account for all sources of building efficiency, (3)The building is not properly maintained, (4)The use of the building has changed over time. LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 According to the measurement and verification protocol what would be required for determination of energy savings? A. ACCURATE MEASUREMENT B. PROPER INVESTIGATION C. ACCURATE VERIFICATION D. PROPER MAINTENANCE E. REPLICABLE METHODOLOGY - correct answers A.&E. The determination of energy savings requires both accurate measurement and replicable methodology, known as a measurement and verification protocol. Commissioning is the process of verifying the building¡¯s energy related systems are installed, calibrated, and perform according to the project requirements. What is commissioning in all the LEED rating systems? A. A NON PROVISION B. A NON PRECAUTION C. A PRECAUTION D. A PRECONSCIOUS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 E. A PREREQUISITE - correct answers E. Commissioning is a prerequisite in all the LEED rating systems. Hydrocarbons (HC) are used as natural refrigerants. Which could you say hydrocarbons that are used as natural refrigerants? (Choose 3) A. PROPANE B. ETHANE C. AMMONIA 氨 D. CARBON DIOXIDE E. ISO-PENTANE - correct answers A, B & E HC, Hydrocarbons, such propane丙烷, butane丁烷, ethane乙烷, isobutene异丁烯, and iso-pentane异戊烷. IEQ ensures excellent indoor air quality and comfort. What is reduced by it? A. TOXINS B. AIR ELEMENTS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 C. DUST D. VIRUSES - correct answers A. Indoor Environmental Quality: Ensure Excellent Indoor Air Quality (IEQ) and Comfort,Reduce Toxins & Pollutants. Whole-building design, as previously mentioned in this study, is the ideal way to work with LEED credits what is created? A. STRATEGIES B. SYNERGIES 协同效应 C. DESIGN PROCESS D. SELECTING SITE - correct answers Whole-building design, as previously mentioned in this study, is the ideal way to work with LEED credits to create synergies. What step would take to control equitably total global emissions of substances that deplete it, with the ultimate objective of their elimination on the basis of developments in scientific knowledge? A. BY TAKING PREVIOUSLY PROTECTIONS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 B. BY TAKING PRECAUTIONARY ACTIONS C. BY TAKING PREVIOUSLY TRIALS D. BY TAKING PRECAUTIONARY MEASURES E. BY TAKING PREVIOUSLY DETERMINATIONS - correct answers D. Determined to protect the ozone layer by taking precautionary measures to control equitably total global emissions of substances that deplete it, with the ultimate objective of their elimination on the basis of developments in scientific knowledge. 33 The project team must make sure the building is functioning as intended based on the design. Which are the other functions of project team that need to be make sure? (Choose 2) For existing buildings, project teams carry out some important responsibilities. For existing buildings, which plan that the project teams must complete? A. A CFC PHASE-OUT PLAN B. WORK DISTRIBUTION PLAN C. SITE SELECTION D. DESIGNING PLAN LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 E. FULFILL THE REQUIREMENTS - correct answers A. A CFC PHASE-OUT PLAN Building analyzing software tools take inputs and determine the energy behavior of a building¡¯s systems over time. What is another feature of the software weather data that can be input into the software? A. AVAILABILITY OF REAL-TIME B. MAXIMUM TIME C. AVAILABILITY OF CONSECUTIVE TIME D. MINIMUM TIME E. AVAILABILITY OF IDLE TIME - correct answers A. AVAILABILITY OF REALTIME Which are the reasons of underperforming the building systems? - correct answers Building systems can underperform for several reasons: (1)The building was not properly configured, (2)The design did not account for all sources of building efficiency, (3)The building is not properly maintained, (4)The use of the building has changed over time. LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 According to the measurement and verification protocol what would be required for determination of energy savings? A. ACCURATE MEASUREMENT B. PROPER INVESTIGATION C. ACCURATE VERIFICATION D. PROPER MAINTENANCE E. REPLICABLE METHODOLOGY - correct answers A.&E. The determination of energy savings requires both accurate measurement and replicable methodology, known as a measurement and verification protocol. Commissioning is the process of verifying the building¡¯s energy related systems are installed, calibrated, and perform according to the project requirements. What is commissioning in all the LEED rating systems? A. A NON PROVISION B. A NON PRECAUTION C. A PRECAUTION D. A PRECONSCIOUS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 E. A PREREQUISITE - correct answers E. Commissioning is a prerequisite in all the LEED rating systems. Hydrocarbons (HC) are used as natural refrigerants. Which could you say hydrocarbons that are used as natural refrigerants? (Choose 3) A. PROPANE B. ETHANE C. AMMONIA 氨 D. CARBON DIOXIDE E. ISO-PENTANE - correct answers A, B & E HC, Hydrocarbons, such propane丙烷, butane丁烷, ethane乙烷, isobutene异丁烯, and iso-pentane异戊烷. IEQ ensures excellent indoor air quality and comfort. What is reduced by it? A. TOXINS B. AIR ELEMENTS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 C. DUST D. VIRUSES - correct answers A. Indoor Environmental Quality: Ensure Excellent Indoor Air Quality (IEQ) and Comfort,Reduce Toxins & Pollutants. Whole-building design, as previously mentioned in this study, is the ideal way to work with LEED credits what is created? A. STRATEGIES B. SYNERGIES 协同效应 C. DESIGN PROCESS D. SELECTING SITE - correct answers Whole-building design, as previously mentioned in this study, is the ideal way to work with LEED credits to create synergies. What step would take to control equitably total global emissions of substances that deplete it, with the ultimate objective of their elimination on the basis of developments in scientific knowledge? A. BY TAKING PREVIOUSLY PROTECTIONS LEED GA Prep Exam Questions and Answers (Verified Answers) Latest Update 2023 B. BY TAKING PRECAUTIONARY ACTIONS C. BY TAKING PREVIOUSLY TRIALS D. BY TAKING PRECAUTIONARY MEASURES E. BY TAKING PREVIOUSLY DETERMINATIONS - correct answers D. Determined to protect the ozone layer by taking precautionary measures to control equitably total global emissions of substances that deplete it, with the ultimate objective of their elimination on the basis of developments in scientific knowledge. 33 The project team must make sure the building is functioning as intended based on the design. Which are the other functions of project team that need to be make sure? (Choose 2)


Document information

Uploaded on
August 8, 2023
Number of pages
13
Written in
2023/2024
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
STUDYROOM2026
3.5
(64)
Sold
412
Followers
212
Items
3879
Last sold
1 month ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.