MGMT 404 Week 2 Course Project Part 1 (Includes Sections A and B) The Getta Byte - New Billing System Project Devry
This project for software Getta Byte was made with one main goal and that is trying tochangetheoldbilling systemwhichisamanualsystemthat isbeingusedcurrently toasystemthat is software based and online. This new system is said to be easy and have very a fast dataentry system. The system already being used can do the duties that are needed already as well.Even though the existing system does things that are needed to do there are something thatwould support this new billing system. The main thing about the old billing system is that It ismanualwhichmeansitisinaccurateat timesandit takesmuch moretime.Aalotoftime goes tomanually putthingsin thesystemand thatmeanssomeone canmessupdotoittakingsolongwhich makes a company’s risk go up. The only solution is to make a billing system that is fastervery accurate, and correct. This new billing system which will be online bases will make thingsmuch
Written for
Document information
- Uploaded on
- July 31, 2023
- Number of pages
- 18
- Written in
- 2022/2023
- Type
- Other
- Person
- Unknown
Subjects
- mgmt 404 week
-
mgmt 404 week 2 course project part 1 includes se
-
mgmt 404 week 2 course project part 1 includes
-
mgmt 404 week 2 course project part 1 include
-
mgmt 404 week 2 course project part 1 i
Also available in package deal