LEED GA Final Exam Practice Questions and Answers | Latest Update 2023/2024 | 100% Verified Solutions
The Triple Bottom Line evaluates the human and environmental effects associated with these - correct answers Social, economics, and environment Construction and demolition debris cannot include 2 of these items - correct answers Rock, Soil To qualify as a regional material, within what distance must a material be extracted, harvested, or recovered, and manufactured? - correct answers 500 miles For storage and collection of recyclables, a building recycling program must include these items: - correct answers Plastic, Cardboard, Metal LEED Green Associate Sample Exam Questions and Answers (Latest Update 2023) (Verified Solutions) To two primary responsibilities of the Green Building Certification Institute (GBCI) are: - correct answers Provides third party LEED professional credentialing, Provides third part LEED project certification Regional Priority credits are made available to the project for - correct answers The zip code of the geographic location of the project The LEED project boundary is defined as - correct answers The boundary description that is submitted for certification The 2009 LEED Rating System best suited for an office complex where the owner will occupy 60% of the building would be - correct answers LEED for New Construction and Major Renovations The minimum FTE requirement per Minimum Program Requirements (MPRs) for LEED Certification is - correct answers 1 FTE A popular program for comparing the energy performance of multiple buildings - correct answers ENERGY STAR LEED Green Associate Sample Exam Questions and Answers (Latest Update 2023) (Verified Solutions) What is unique about the Innovative Performance requirement for the Innovation in Design credit? - correct answers It is not applicable to existing or similar strategies in the LEED rating system The major consideration when developing a sustainable project budget: - correct answers Life Cycle Costs The EPAct 1992 water standard excludes which types of fixtures and equipment? - correct answers residential and commercial dishwashers, commercial steam cookers, automatic commercial ice makers, residential and commercial clothes washers Which statement is true for a project to qualify for the LEED for Homes rating system? - correct answers The project can be a 3 story or less lowrise multifamily residential project Who can offer an alternative way to provide verification for a number of submittals in a project application for LEED certification? - correct answers LEED Green Associate Sample Exam Questions and Answers (Latest Update 2023) (Verified Solutions) Licensed Professional (a board certified Professional Engineer, Registered Architect, or Registered Landscape Architect Source reduction relates to - correct answers Waste prevention How many levels, or tiers, of LEED professional accreditation are available? - correct answers 3 - Green Associate, AP with Specialty, AP Fellow The two primary responsibilities of the U.S. Green Building Council (USGBC) are: - correct answers Develops LEED Green Building Rating Systems, Develops and provides LEED based education and research projects Two primary benefits of using pervious materials for hardscapes (parking lots, walks, and patios): - correct answers Improve stormwater quantity and quality Credit Weightings are used to evaluate the credit with respect to - correct answers Environmental and human health LEED Green Associate Sample Exam Questions and Answers (Latest Update 2023) (Verified Solutions) The Energy Policy Act of 1992 addresses these types of fixtures or equipment - correct answers Water closets, urinals, lavatory faucets, sink faucets, showerheads, prerinse spray valves Where can the USGBC logo NOT be used? - correct answers Packaging, Products
Document information
- Uploaded on
- July 22, 2023
- Number of pages
- 18
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers