Navy MTS Exam| 246 Questions| With Complete Solutions
Explain the 5 parts of the ORM process correct answer: Identify Hazards Assess Hazards Make Risk decisions Implement Controls Supervise Define "high-risk" course correct answer: Known or unknown state where there is an elevated probability of loss/damage to personnel or equipment. What types of courses are considered "high-risk" correct answer: Student or equipment loss/damage during training. Discuss the difference between "voluntary" and "involuntary" courses. correct answer: Voluntary: Sailor has voluntary enrolled and has the ability to drop on request. Involuntary: Sailor is enrolled through the training pipeline and is part of their job. Discuss "Drop on Request" and the procedures for conducting one. correct answer: A student only needs to make such intentions known and will be immediately removed from the training area. Summary will be documented in their service record and a copy is maintained within the commands records. Discuss the purpose of an Emergency Action Plan (EAP) and its periodicity. correct answer: Internal plan to aid people throughout a specific emergency. Must be rev
Document information
- Uploaded on
- July 11, 2023
- Number of pages
- 43
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers