AMP Study Guide Questions with complete solution 2023
AMP Study Guide Questions with complete solution 2023 Belleville Hydroelectric Plant - correct answer 42 MW run-of the river plant Belleville Locks and Dam (Belleville, West Virginia) Opened in 1999; 8 Full time staff members Operates for 42 AMP Communities Contributes 2.5 mil - 3 mil to the economy (800,000 to school and govt. in-lieu-of-taxes) April 2010, Outstanding Stewards of American Waterways Award for Operational Excellence (safety program that yielded more than 150,000 work hours without a lost-time or reportable incident over the last 10 years Runs very well, so customers pay 34% less 2014 was the second consecutive record-setting year of performance for the facility (Gen, 304,007 exceeds record by ) 4millionth megawatt hour (net) achieved on Feb 3 2015 Six months faster than expected Cannelton Hydroelectric Plant- Under Construction - correct answer 84 MW run of the river project Cannelton Locks and Dam, Hawesville Kentucky (1.5 Hr from Louisville, and across river from AMP member Cannelton, Indiana Kentucky Side of the River 520 Construction jobs over 4 yrs Partially staffed and filling remaining potions with commissioning under way Excavation and cofferdam Construction started in 2009 (Kiewit/Traylor Construction) (Omaha, NE/ Evansville, IN) as the contractor Powerhouse Construction: June 2011 (Walsh Construction Grouo, Chicago Illinois) Safex (Westerville, OH) safety consultant Formal groundbreaking took place AUg. 5, 2009. The event featured Kentucky Gov. Steve Beshear, Congressman Brett Guthrie, US Army Corps of Engineers (USACE), FERC
Document information
- Uploaded on
- July 5, 2023
- Number of pages
- 8
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers