Questions With Complete Solutions
True or False: If you have a project with more than one building or area, you should enable the "Drawings by Area" feature. correct answer: True
True or False: It's important to discuss best practices in formatting your drawings with the design Team to ensure that the drawings are seamlessly processed in Procore. correct answer: True
True or False: When you click a project's Drawings tool in the Procore web app, you should expect to see the project's "current set" of drawings. (i.e. The most recently uploaded revision of each drawing.) correct answer: True
How can you draw a straight line while marking up your drawing? correct answer: Hold shift key when drawing a line
Who can view drawing markups on your 'Personal' layer? correct answer: Only You
True or False: When you add a markup to a drawing, any markups will be immediately available to your team without further action on your part. correct answer: False True or False: You can now have your Design Team upload drawings directly to the Drawings tool without having the drawings be published immediately. correct answer: True
You should upload shop drawings to Procore's Drawings tool. correct answer: False
True or False: Procore automatically sends an email to users with 'Admin' permissions on the Drawings tool when new drawings have been uploaded and are ready to be reviewed and published. correct answer: True
What is an important best practice you should communicate to the Design Team about the formatting of the spec book?
a. The table of contents should be in the first 25 pages of the spec book
b. The spec section number and description should be in the header and footer of every page
c. There shouldn't be any other string of numbers that looks like a spec section number in the header and footer of the page (e.g. a project ID)
d. All of the above correct answer: d. All of the above
True or False: Before you publish your spec book to the team, you should make sure there's a break between every spec section. correct answer: True
True or False: To upload a revision to your spec book, you will first need to delete the old version from Procore. correct answer:
False