• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 9 pages
Exam (elaborations)

Ust Inspector Quiz|2023 Latest Update|Guaranteed Success

Document preview thumbnail
Preview 2 out of 9 pages

How long does an owner have to fix a significant violation that does not pose an imminent threat to human health and safety or environment before being issued a red tag? a) 24 hours b) 48 hours c) 7 days d) 30 days c) 7 days; CCR 2717.1(b) Which one of the following can perform ELD? a) licensed tank tester b) licensed state contractor c) ICC certified service technician d) Professional Engineer a) licensed tank tester; CCR2644.1 and 2643(f); HSC 25484.4 00:01 04:07 Which one contains the requirements for installing, repairing, and monitoring UST's? a) Health and Safety Code Chapter 6.7 b) Fire Code ABCD c) California Code of Regulations Chapter 16, Title 22 d) Code of Federal Regulations, 29 Chapter 6 a) HSC Chapter 6.7 and CCR Title 23 A monitoring system certification includes all of the following EXCEPT a) submittal of a completed Monitoring System Certification form b) pre-notification to the local agency of scheduled Monitoring System Certification date c) affixing a tag/sticker to each monitoring equipment component that is certified, repaired, or replaced d) posting the Monitoring System Certification from a visible location at the UST facility d) posting the Monitoring System Certification from a visible location at the UST facility; CCR 2638 Which of the following is not a valid overfill prevention method? a) Spill bucket b) ATG with audible/visual alarm c) Ball float valve d) Flapper valve a) Spill bucket; CCR 2635(b)(2) What is the purpose of interstitial monitoring? a) to detect leaks in the UDC's b) to detect the presence of fluid between the primary and secondary containment c) to monitor tank volume d) to regulate fuel flow to the dispenser b) to detect the presence of fluid between the primary and secondary containment; CCR 2611 If a release has occurred from a single-walled tank, may the tank be lined? a) No, not if a release has occurred b) Yes, if it has been lined before c) Yes, if the tank owner can demonstrate it will provide continued containment d) Yes, if the tank is less than 10,000 gallons c) Yes, if the tank owner can demonstrate it will provide continued containment; CCR 2660(k), HSC 25296 A tank may be repaired in the following manner: a) using a 12" x 12" fiberglass cloth centered on the repair b) using tank manufacturer approved epoxy or resin c) with self tapping bolts d) all of the above d) all of the above; CCR 2661 Which of the following is not a confined space? a) space not designed for continuous employee occupancy b) area with limited access c) area with limited ventilation d) really deep turbine sump c) area with limited ventilation; CCR Title 8, 5157(b) Where is a red tag applied? a) on the turbine head b) on the fill tube c) on the dispenser hose d) on the cash register b) on the fill tube; CCR 2717.1(a) What must pressurized piping systems have installed by November 9, 2004 a) double walled spill buckets b) hydro statically lined UDC's c) line leak detectors d) automatic tank gauging c) line leak detectors; CCR 2636 (f)(2) The local agency inspectors shall renew the ICC certification? a) by passing the inspector exam or equivalent approved criteria b) every 36 months c) via correspondence course d) there is no renewal required a) by passing the inspector exam or equivalent approved criteria; CCR 2715(j) 00:01 04:07 A tank system under temporary closure must be inspected at what interval? a) monthly b) every 3 months c) every 6 months d) annualy b) every 3 months; CCR 2671(c) UST system includes what components a) tank only b) piping only c) tank, associated piping and ancillary equipment d) tank, piping, dispensing units, and nozzles c) tank, associated piping and ancillary equipment; HSC 25281(z) The exterior surface of an underground tank must bear a marking or label which shows the following information, except: a) width of the interstitial space b) design pressure in PSIg c) usable capacity in gallons d) identity of manufacturer a) width of the interstitial space; CCR 2631(b) Secondary containment system shall contain what amount of a tank if only one tank is located in containment? a) 50% b)100% c) 150% d) 200% b)100%; HSC 25291(a)(3), CCR 2631(d)(1)(A) Multiple primary containers within a single secondary containment system, the secondary containment system shall be large enough to contain 150 percent of the volume of the largest primary container within it, or 10% of the aggregate internal volume of all primary containers within the secondary containment system, whichever is greater. CCR 2631(d)(1)(B) Which of the following is exempt from secondary containment testing? a) monitored turbine sumps b) UDC's c) secondary piping d) hydrostatically monitored annulars d) hydro statically monitored annulars; CCR 2637(g) How long does the local agency have to notify the tank owner that a red tag has been issued? a) 12 hours b) 24 hours c) 48 hours d) 5 days b) 24 hours; CCR 2717.1(a) How long must cathodic protection maintenance records be maintained? a) 1 year b) 5 years c) 6.5 years d) 7 years c) 6.5 years; CCR 2712(b) Temporary closure is appropriate for which of the following: a) the tank system is empty and will be removed from service indefinitely b) the tank system is unable to meet compliance requirements and will be removed c) the tank system has ceased to store hazardous substances but will be used within the next 12 consecutive months d) the tank system has been red tagged c) the tank system has ceased to store hazardous substances but will be used within the next 12 consecutive months; CCR 2671 & 2670 Single walled tanks containing the following substances must be upgraded to double-walled with the exception of: a) solvent tanks b) waste oil tanks c) motor vehicle fuels tanks d) tanks containing liquids with pH9 c) motor vehicle fuels tanks; CCR 2662(b)


Document information

Uploaded on
June 4, 2023
Number of pages
9
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$15.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GUARANTEEDSUCCESS
4.3
(253)
Sold
695
Followers
314
Items
24783
Last sold
5 days ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.