• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 21 pages
Exam (elaborations)

Work Center Supervisor Final Exam 2023 Questions And Answers Complete

Document preview thumbnail
Preview 3 out of 21 pages

WORK CENTER SUPERVISOR FINAL EXAM 2023 QUESTIONS AND ANSWERS COMPLETE 1. A work center can take credit for a PMS check if 80% of the check can be completed? a. True. b. False FALSE 2. How often will the PMS check 4211/001 Q-6R have to be accomplished? a. Once per Quarter only. b. Once per Quarter, if required. c. As required. d. Once per Quarter, or as required. Once per Quarter, or as required. 3. A Caution Tag is used whenever? a. Operation of equipment that can jeopardize safety to personnel. b. Operation of equipment that can endanger equipment, systems, and/or components. c. Precautionary measures, to provide temporary special instructions as needed. d. When conducting routine PMS. Precautionary measures, to provide temporary special instructions as needed. 4. What are the duties/responsibilities of the second person on an equipment tag-out procedure? a. To verify performance of a maintenance requirement. b. To act as a safety observer. c. To verify a circuit is properly de-energized. d. To verify proper tag attachment and positioning of switch/value. To verify proper tag attachment and positioning of switch/value. 5. Who reviews, and approves via signature, the Weekly PMS Schedule? a. The Division Officer. b. The Department Head. c. The 3-M Coordinator. d. The Executive Officer. The Division Officer. 6. The Maintenance Data System (MDS) is the means in which work center supervisors can? a. Report corrective maintenance actions and equipment condition. b. Generate a request for assistance outside of the command. c. Report the installation of a new configuration change. d. All of the above. All of the above. 7. The LOEP contains all of the following information except: a. Equipment Nomenclature. b. Work Center responsible for the system.

Content preview

WORK CENTER SUPERVISOR FINAL EXAM 2023
QUESTIONS AND ANSWERS COMPLETE

1. A work center can take credit for a PMS check if 80% of the check can be
completed?
a. True.
b. False
FALSE
2. How often will the PMS check 4211/001 Q-6R have to be accomplished?
a. Once per Quarter only.
b. Once per Quarter, if required.
c. As required.
d. Once per Quarter, or as required.
Once per Quarter, or as required.
3. A Caution Tag is used whenever?
a. Operation of equipment that can jeopardize safety to personnel.
b. Operation of equipment that can endanger equipment, systems, and/or
components.
c. Precautionary measures, to provide temporary special instructions as needed.
d. When conducting routine PMS.
Precautionary measures, to provide temporary special instructions as needed.
4. What are the duties/responsibilities of the second person on an equipment tag-
out procedure?
a. To verify performance of a maintenance requirement.
b. To act as a safety observer.
c. To verify a circuit is properly de-energized.
d. To verify proper tag attachment and positioning of switch/value.
To verify proper tag attachment and positioning of switch/value.
5. Who reviews, and approves via signature, the Weekly PMS Schedule?
a. The Division Officer.
b. The Department Head.
c. The 3-M Coordinator.
d. The Executive Officer.
The Division Officer.
6. The Maintenance Data System (MDS) is the means in which work center
supervisors can?
a. Report corrective maintenance actions and equipment condition.
b. Generate a request for assistance outside of the command.
c. Report the installation of a new configuration change.
d. All of the above.
All of the above.
7. The LOEP contains all of the following information except:
a. Equipment Nomenclature.
b. Work Center responsible for the system.

,c. Date LOEP was produced.
d. The periodicity code for each maintenance requirement.
The periodicity code for each maintenance requirement.
8. Who has overall responsibility for ensuring the 3-M system functions within the
command?
a. The Commanding Officer.
b. The Executive Officer.
c. The 3-M coordinator.
d. The Engineering Officer.
The Commanding Officer.
9. An OPNAV 4790/CK is used to report discrepancies/deficiencies in the PMS
system?
a. True.
b. False.
False.
10. Which document provides a listing of the MIP's assigned to a specific work
center?
a. OPNAVINST 4790.4 (Series).
b. Equipment Pages Listing.
c. Tag-out Log Guide List (EGL).
d. List Of Effective Pages (LOEP).
List Of Effective Pages (LOEP).
11. Once the Quarterly PMS Schedule has been authorized, the Work Center
Supervisor must update it every week?
a. True.
b. False.
True.
12. Who is the Ship's 3-M Manager?
a. The Commanding Officer.
b. The Executive Officer.
c. The 3-M coordinator.
d. The Engineering Officer.
The Executive Officer.
13. According to OPNAVINST 4790.4, a single EGL should contain no more than
__________ work?
a. 4 Hours.
b. 8 Hours.
c. 12 Hours.
d. A single week's.
8 Hours.
14. To request a replacement for a lost or damaged MRC that is classified, the
Work Center Supervisor should fill out a:
a. OPNAV 4790/2K.
b. OPNAV 4790/CK.
c. OPNAV 4790/7B (Category A).
d. OPNAV 4790/7B (Category B).

, OPNAV 4790/7B (Category A).
15. An MRC card with SYSCOM MRC Control Number A7 4ABG N has a
production (birth) date of?
a. October 1997.
b. August 1997.
c. April 1994.
d. November 1994.
October 1997.
16. Which of the following is NOT an example of an IEM MRC?
a. LU-1.
b. SU-2.
c. PM-2.
d. U-1.
U-1.
17. Equipment is placed in IEM Status I whenever...
a. The equipment is removed for overhaul.
b. The equipment is down and is awaiting repair parts.
c. The equipment will not be operated for 7 days or more.
d. The Department Head feels like it.
The equipment will not be operated for 7 days or more.
18. What is attached to a MRC and lists identical item at different locations?
a. EIC.
b. EGL.
c. APL.
d. MIP.
EGL.
19. Which Tag-Out Log would a Supply Department DCPO use to accomplish a
DC related tag-out?
a. Supply Tag-out Log.
b. Operations Tag-out Log.
c. Combat Systems Tag-out Log.
d. Engineering Tag-out Log.
Engineering Tag-out Log.
20. A Classified maintenance requirement card is what color?
a. White.
b. Blue.
c. Pink.
d. Green.
Pink.
21. Which document provides instructions and references required for use in the
3-M System?
a. OPNAVINST 3120.3(series).
b. OPNAVINST 5100.19(series).
c. OPNAVINST 4790.4(series).
d. OPNAVINST 4441.170A.
OPNAVINST 4790.4(series).

Document information

Uploaded on
May 14, 2023
Number of pages
21
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$9.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
StarNurse
2.0
(2)
Sold
14
Followers
9
Items
335
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions