CYB-210 Project Two Network Design Rationale
CYB-210 Project Two Network Design Rationale. The first requirement is to create a new IP config that combines both Subnet1 and Subnet2 into a new network, NetworkA; which must be a Class C network. To do this, we removed the switch for Subnet2 and connected all those devices to the switch for Subnet1. The switch was renamed to NetworkA_Switch and is now accommodating all devices previously on Subnet1 and Subnet2, which have also been renamed accordingly. The IP Address for NetworkA is set to 192.168.50.0/24, and the switch has been configured with a new VLAN, VLAN 50. All interfaces being used by connected devices have been switched to use the new VLAN 50 profile, now known as NetworkA.
Written for
- Institution
-
Southern New Hampshire University
- Course
-
CYB-210 (CYB210)
Document information
- Uploaded on
- April 21, 2023
- Number of pages
- 3
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- cyb 210
- cyb 210 project two
- network design rationale
-
cyb 210 project two network design rationale
Also available in package deal