NCARB Practice Exam Questions And Answers | Verified Solutions Graded A+ 2023
NCARB Practice Exam Questions And Answers | Verified Solutions Graded A+ 2023 A developer hires an architecture firm to design a new apartment building. The firm completes construction documents and a building permit is issued. The firm will provide CA services at a rate of $200 per hour for the principal and $150 per hour for the project manager. As the firm starts CA, the owner asks for a not-to-exceed fee based on the following: -Twenty shop drawings, which the project manager will handle at an average of three hours per review. -Three site visits, which the principal will handle at an average of four hours per site visit. The firm includes a 10% allowance for unknowns. What should the not-to-exceed fee be? A.$11,400 B.$12,540 C.$13,800 D.$15,240 CORRECT RESPONSE $12,540 CALCULATIONS 1. Shop drawing review: $150 per hour (project manager) x 3 hours per review x 20 shop drawings
Written for
- Institution
-
Architect Registration Examination
- Course
-
NCARB
Document information
- Uploaded on
- April 19, 2023
- Number of pages
- 25
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
ncarb practice exam questions and answers | verified solutions graded a 2023
-
ncarb practice exam questions
-
an architecture firm is updating their rules for the proper dimensioning of their architectu
Also available in package deal