SAFe Agile Scrum Master Study Guide (Answered) Verified Solution
SAFe Agile Scrum Master Study Guide (Answered) Verified Solution ART Agile Release Train PO Project Owner PI Program Increment Innovation and Planning Iteration Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. What is the recommended timebox duration for an Iteration? 2 weeks; however, 1-4 weeks is acceptable, depending on the business context. Who participates in the Inspect & Adapt (I&A) phase? All stakeholders, including: 1. The Agile Teams 2. Release Train Engineer (RTE) 3. System and Solution Architect Engineering 4. Product Management, Business Owners, and others on the Train What results from the I&A phase? Improvement backlog items that go to the Program Backlog for the next PI Planning event 3 parts of I&A PI System Demo Quantitative Measurement Retrospective and Problem-Solving Workshop Purpose of PI System Demo To show all the Features the ART has developed over the course of the PI PI System Demo Timebox ~1 hr or less What is one primary measurement to be considered in quantitative metrics? Program predictability measure Retrospective goal To identify whatever issues they would like to address
Document information
- Uploaded on
- April 17, 2023
- Number of pages
- 7
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers