• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 2 pages
Exam (elaborations)

Bailey Bridge Exam; GUARANTEED A+

Document preview thumbnail
Preview 1 out of 2 pages

Given a 210-foot TT bridge. What is the position of launching-nose links? correct answers 30 feet & 40 feet How many personnel does the routine repair detail consists of? correct answers 6 How many personnel does the maintenance party usually consist of for important bridges subject to enemy action? correct answers The entire assembly crew What is the required safety setback on an unprepared abutment if the bank height is 6 feet? correct answers 1.5 x 6 feet = 9 feet Given a 140-foot TS bridge with grillage type 1 on both the near shore (NS) and far shore (FS). The far-bank seat is level with the near-bank seat. What is the position of the launching-nose links? correct answers 20 feet & 40 feet How is the initial bridge length determined? correct answers By adding the width of the gap, the safety setbacks, and the roller clearances What is the purpose of construction rollers? correct answers Aid in inserting the launching-nose links and provide clearance between the links and the ground How many NCOs and enlisted members are on the transom crew to construct a TT Bailey bridge? correct answers 2 NCOs and 28 enlisted members What are the different types of stringers? correct answers Plain and Button How many unloading parties are needed for a 100-foot DS bridge? correct answers 5 unloading parties How far should the extra set of plain rollers (called construction rollers) be placed temporarily behind the rocking rollers when determining longitudinal spacing? correct answers 12 ½ feet What is the center-to-center roller spacing? correct answers 14 feet 10 inches Where are all of the measurements taken from for the rollers during site layout? correct answers The center of the roller to the center of the next roller How many total personnel are needed to construct a TD Bailey bridge? (Manpower only) correct answers 98 personnel How many transoms per bay are required to support vehicles over class 70? correct answers 4 - two in the middle and one at each end of the panel


Document information

Uploaded on
March 20, 2023
Number of pages
2
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$10.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
ProPerfomer
3.8
(84)
Sold
450
Followers
322
Items
8858
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions

Whoops! We can’t load your doc right now. Try again or contact support.