Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Exam (elaborations)

SAFe Scrum Master Study Guide 5.0, Complete Solution 2022/2023

Rating
-
Sold
-
Pages
20
Grade
A+
Uploaded on
11-03-2023
Written in
2022/2023

SAFe Scrum Master Study Guide 5.0, Complete Solution 2022/2023 Agile frameworks SAFe Scrum Crystal Kanban eXtreme Programming (XP) Feature-driven development What does a Scrum Master do? - Servant leaders and coaches for an Agile Team. - Help educate team in Scrum, XP, Kanban and SAFe, ensuring the agreed Agile process is being followed. - Help remove impediments and foster an environment for high-performing team dynamics, continuous flow and relentless improvement. - Facilitates team events - Works with RTE to ensure train meets PI objectives - Fosters normalized estimating within the team - Assists the PO in backlog for PI and IP. - Attends scrum of scrum meetings. ART Agile Release Train PO Product Owner Program Increment (PI) Planning A cadence-based, face-to-face event that serves as the heartbeat of the Agile Release Train (ART), aligning all the teams on the ART to a common mission and vision. Innovation and Planning Iteration Occurs every PI and serves multiple purposes. It acts as an estimating buffer for meeting PI objectives, as well as providing dedicated time for innovation, continuing education, and PI planning and Inspect and Adapt (I&A) events. Inspect & Adapt (I&A) A significant event, held at the end of each PI, where the current state of the solution is demonstrated and evaluated by the train. Teams reflect and identify improvement backlog items via a structured, problem-solving workshop Iteration A basic building block of Agile development. Each is a standard, fixed-length timebox, where Agile Teams deliver incremental value in the form of working, tested software and systems. Cycle - Defines, builds, integrates, & test. What is the recommended timebox duration for an Iteration? 2 weeks; however, 1-4 weeks is acceptable, depending on the business context. Who participates in the Inspect & Adapt (I&A) phase? All stakeholders, including: 1. The Agile Teams 2. Release Train Engineer (RTE) 3. System and Solution Architect Engineering 4. Product Management, Business Owners, and others on the Train What results from the I&A phase? Improvement backlog items that go to the Program Backlog for the next PI Planning event 3 parts of I&A PI System Demo Quantitative Measurement Retrospective and Problem-Solving Workshop Purpose of PI System Demo To show all the Features the ART has developed over the course of the PI Leads: PM, PO, System Team Attend: BO, Stakehlders, PM, RTE, SM & Teams PI System Demo Timebox ~1 hr or less What is one primary measurement to be considered in quantitative metrics? Program predictability measure Updated end of inspect & adapt event Retrospective goal To identify whatever issues they would like to address Retrospective objective To identify a few significant problems that the teams can potentially address - What went well, what didn't go well, what can do better next time. PDCA Cycle Plan Do Check Adjust Who facilitates the PI Planning event? Release Train Engineer (RTE) In which iteration does PI Planning take place? Innovation and Planning Iteration __ ________ is essential to SAFe; if you are not doing it, you are not doing SAFe. PI Planning Business Benefits of PI Planning - Establishing face-to-face communication across all team members and stakeholders - Building the social network the ART depends on aligning development to business goals with the business context, vision, and team project PI objectives - Identifying dependencies and fostering cross-team and cross-ART collaboration - Providing the opportunity for "just the right amount of architecture and Lean User Experience (UX) guidance) - Matching demand to capacity, eliminating excess WIP - Fast decision-making PI Planning Inputs Business context Roadmap and vision Top 10 features of the Program Backlog NFRs (Non-functional Requirements) PI Planning Outputs Committed PI objectives (A set of SMART objectives that are created by each team with the business value assigned by the Business Owners) Program board (this highlights the new feature delivery dates, feature dependencies among teams and with other ARTs, and relevant milestones) Plan is the goal 3 Areas of Preparation for a Successful PI Planning Organizational Readiness Content Readiness Facility Readiness Organizational Readiness Strategic alignment and teams trains setup Content Readiness Management and development preparedness Facility Readiness The actual space and logistics for the event Organizational Readiness Considerations Planning scope and context - is the scope (product, system or technology domain) of the planning process understood? Do we know which teams need to plan together? Business alignment - is there reasonable agreement on priorities among Business Owners Agile teams - Do we have Agile teams? Are there dedicated developer and test resources and an identified Scrum Master and Product Owner for the team? Content Readiness Considerations Executive briefing - a briefing that defines the current business context Product vision briefing(s) - briefing(s) prepared by Product Management including the top 10 features in the product backlog Architecture vision briefing - a presentation made by the CTO, Enterprise Architect, or System Architect to communicate new enablers, features, and Nonfunctional Requirements (NFRs) Facility Readiness Considerations Facility - this room must be roomy enough for all attendees, with breakout rooms if necessary Facilities/tech support - these people need to be identified in advance and reachable during setup and testing, and the event itself Communication channels - for distributed planing meetings, primary and secondary audio, video, and presentation channels must be available Stretch Objectives Goals built into the plan (e.g., stories that have been defined and included for those objectives), but are not committed to by the team because of too many unknowns or risks. These are NOT extra things to do in case there is time. Instead, they increase the reliability of the plan and give management an early warning of goals that the ART may not be able to deliver Time & capacity to do it, we plan for it, but are not committed to it PI Planning Day 1 Agenda Business context Product/solution vision Architecture vision and development practices Planning context and lunch Team breakouts #1 Draft plan review Management review and problem-solving Business context A senior executive/line-of-business owner describes the current state of the business and presents a perspective on how well existing solutions are addressing current customer needs Product solution/vision Product management presents the current program vision (typically represented by the next top 10 upcoming features) and highlights any changes from the previous PI Planning meeting as well as any forthcoming Milestones. Architecture vision and development practices System Architect/Engineering presents the architecture vision. Also, a senior development manager may introduce Agile-supportive changes to development practices such as test automation, DevOps, Continuous Integration, and Continuous Deployment, which are being advanced in the upcoming PI Planning context & lunch The RTE presents the planning process and expected outcomes of the meeting Team Breakouts #1 Teams estimate their capacity (velocity) for each Iteration and identify the backlog items they will likely need to realize the features. Each team creates their team plan, visible to all, iteration by iteration Draft plan review Tightly timeboxed; teams present key planning outputs, including draft objectives, potential risks and dependencies. Business Owners, Product Management and other teams and stakeholders review and provide input Management review and problem-solving During this, management may negotiate scope changes and resolve other problems by agreeing to various planning adjustments. The RTE facilitates and keeps the primary stakeholders together for as long as necessary to make the decisions needed to reach achievable objectives

Show more Read less










Whoops! We can’t load your doc right now. Try again or contact support.

Document information

Uploaded on
March 11, 2023
Number of pages
20
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers

Subjects

$16.99
Get access to the full document:

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Get to know the seller

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BESTPUBLISHER01 College Of Nursing And Technology
View profile
Follow You need to be logged in order to follow users or courses
Sold
11
Member since
3 year
Number of followers
12
Documents
978
Last sold
1 year ago
BESTPUBLISHER01

NURSING, ECONOMICS, MATHEMATICS, BIOLOGY, AND HISTORY MATERIALS BEST TUTORING, HOMEWORK HELP, EXAMS, TESTS, AND STUDY GUIDE MATERIALS WITH GUARANTEED A+ I am a dedicated medical practitioner with diverse knowledge in matters of Nursing and Mathematics. I also have a piece of additional knowledge in Mathematics based courses (finance and economics).

3.0

1 reviews

5
0
4
0
3
1
2
0
1
0

Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions