PSM 1 Practice Test With Correct Answers 2023 Complete Solution
PSM 1 Practice Test With Correct Answers 2023 Complete Solution. The Daily Scrum always should take exactly 15 minutes. For example, if your team managed doing it in 5 minutes, you should spend 10 more minutes on some useful team activity like Product Backlog refinement, but not more (T/F) - Answer False All events in Scrum are time-boxed. It means that every event has a maximum duration. However, the Scrum Guide does not require a minimal duration for any event. As Scrum Teams mature, they can do some events faster (e.g. the Sprint Planning or the Sprint Retrospective). Who has the authority to cancel the Sprint? - Answer The Product Owner Only the Product Owner has the authority to cancel the Sprint, although he or she may do so under influence from the stakeholders, the Development Team, or the Scrum Master. The Scrum Master does the following regarding the Daily Scrum - Answer Teaches the Development Team to keep the Daily Scrum within the 15-minute time-box Ensures that the Development Team has the meeting If others are present at the Daily Scrum, ensures that they do not disrupt the meeting Is it allowed to skip the Daily Scrum if there is nothing interesting to talk about? - Answer No Each event in Scrum is a formal opportunity to inspect and adapt something. These events are specifically designed to enable critical transparency and inspection. Failure to include any of these events results in reduced transparency and is a lost opportunity to inspect and adapt. What is the input to the Sprint Planning? - Answer The Product Backlog The latest product Increment Projected capacity of the Development Team during the Sprint Past performance of the Development Team How does the Scrum Master serve the Organization? - Answer Working with other Scrum Masters to increase the effectiveness of the application of Scrum in the organization Leading and coaching the organization in its Scrum adoption Planning Scrum implementations within the organization Who is responsible for coping with incomplete artifact transparency? - Answer The Scrum Master
Written for
- Institution
- PSM 1
- Course
- PSM 1
Document information
- Uploaded on
- March 10, 2023
- Number of pages
- 12
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
- psm 1
- psm
- psm 1 practice test
-
psm 1 practice test with correct answers 2023 complete solution
-
psm 1 practice test with correct answers 2023