Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 19 pages
Exam (elaborations)

3RD Class Stationary Steam Engineer License Prep Exam Questions And Answers 100% Correct

Document preview thumbnail
Preview 3 out of 19 pages

3RD Class Stationary Steam Engineer License Prep Exam Questions And Answers 100% Correct

Content preview

3RD Class Stationary Steam Engineer License Prep
Exam Questions And Answers 100% Correct


_________ are necessary for complete combustion - time, temperature, mixture, and atomization


if the steam pressure gauge indicates 200 PSIG, the absolute pressure is______ - 214.7


a boiler is operating at 400 PSI, and the safety valve opens at 410 PSI and closes at 398 PSI. The
blowdown is______psi - 12


an oil cooler is commonly used with a(n) ________ when operating in conjunction with a turbo-
generator - steam turbine


a boiler is producing 40,000lb of steam/hr at a pressure of 100 PSI and a steam temperature of 500
degrees Fahrenheit. The steam produced is _______ steam - superheated


the economizer on a boiler is used to _______ - add heat to the feed water


blowers are normally used with________ boilers - water tube


overheating of tubes on a boiler can be caused by________ - scale on tubes


carbon dioxide in a condensate return system causes_________ - channeling


a ________ pump is a positive displacement pump - reciprocating


a boiler generating 6000 lb of steam/hr produces _______btu/hr - 6,000,000


a bottom blowdown is performed on a boiler to _____ - discharge sludge and sediment

,water columns are connected to the boiler with a minimum of _______" pipe - 1


the minimum size of a water column blowdown valve is_______". - 3/4


the maximum size bottom blowdown valve on a boiler is_________". - 2 1/2


a ________ allows condensate to pass through, but stops Steam. - a steam trap


when taking over a shift, the first thing to do is check the________ - water level in each boiler


according to the asme code, a high-pressure boiler having more than 500 square feet of heating
surface shall have________ - two or more safety valves


the probable cause of an increase in temperature of gases of combustion at the boiler Outlet is____ -
dirty heating services


boilers in battery equipped with________ must have two main steam stop valves and a free-flowing
drain between them - manhole openings


in order to be sure the gauge glass is indicating an accurate water level reading, the stationary
engineer should______ - blowdown the gauge glass


a continuous blowdown line is located___ - in the Steam and water drum well below the nowl


a temperature reading of 80 degrees Celsius is equal to_________°f - 176


a chimney temperature of 250 degrees Fahrenheit above steam temperature indicates_______ - poor
efficiency


a manometer is red in________ - inches of water

, the boiling point of water will____ with an increase in pressure - be raised


if a lather is not obtained when performing a soap hardness test, the water sample is_______ - hard


combustion efficiency can be increased when air is________ - preheated


______ draft is produced by a fan located between the boiler and the chimney - induced


the overspeed trip on a steam turbine should be tested ______ - before putting the steam turbine on-
line


a high CO2 reading in the gases of combustion is a sign of____ - High combustion efficiency


the purpose of chemically treating feedwater is to________ - turn scale-forming salts to a non
adhering sludge


water in a d rating feed water heater is prevented from entering the steam line by a(n) _______. - Loop
seal or internal overflow


a steam turbine operating at 3600 RPM will trip at_________ rpm - 3960


he steam line going to The Blowers is connected to the main ________ - steam drum


before using blowers on a boiler,________ - drain set blower lines


an accumulation of snow on the Fireside of a boiler tubes________ - decreases boiler efficiency


a globe valve installed in the feed water line between the feed water pump and boiler has a pressure
from the feed water pump_________ the valve disc - under

Document information

Uploaded on
February 26, 2023
Number of pages
19
Written in
2024/2025
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Stuviatlas
3.8
(436)
Sold
1871
Followers
1470
Items
7359
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions