Exam (elaborations)
When a new system has been assembled, the first thing to do is? Pressurize the system with an inert gas & leak check. After installation of a field-piped R-410A split heat pulp, the unit should first be? Pressurized with nitrog
Rating
Sold
-
Pages
19
Grade
A+
Uploaded on
12-01-2023
Written in
2022/2023
Refrigeration technicians who violate the Clean Air Act can: - Lose their EPA certification, be fined, be required to appear in Federal court. After 1995, any supplies of CFC refrigerants to service existing units in the USA can only come from: - recovery and recycling
Show more
Read less
Institution
New System
Course
New system
Whoops! We can’t load your doc right now. Try again or contact support.
Written for
- Institution
- New system
- Course
- New system
Document information
- Uploaded on
- January 12, 2023
- Number of pages
- 19
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
when a new system has been assembled
-
the first thing gas amp leak check after installation of a field piped r 410a split heat pulp
$15.99
Get access to the full document:
100% satisfaction guarantee
Immediately available after payment
Both online and in PDF
No strings attached