CSLB B LICENSE GENERALCONTRACTOR EXAM
CSLB B LICENSE GENERALCONTRACTOR EXAMCSLB B LICENSE GENERAL CONTRACTOR EXAM If unused mortar stiffens due to hydration of cement, what must you do? - Discard the mortar What minimum time must you wait before caulking or grouting new tiles? - 24-48 Hours How long should you wait before installing tile on a shower pan? - 24 Hours Unstable dry rock, angular gravel, sandy loam, and cohesive soils having compressive strengths greater than 0.5 and less than 1.5 tons/sq ft (tsf), are typical examples of: - Type-B Soils If 65 street lights are fed by a 2275-volt series circuit, what is the voltage across each light? - 35V In a series circuit, the total voltage is divided equally. For safety reasons, the maximum simple slope of an excavation, up to 20 ft deep, in Type-B soil is: - 1:1 (45°) A Pittsburgh joint is used in: - HVAC ductwork The drain for a pressure relief valve on a water heater should be extended to: - The outside of the building What is the minimum slope toward
Written for
- Institution
-
Liberty University
- Course
-
CSLB
Document information
- Uploaded on
- December 15, 2022
- Number of pages
- 30
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers
Subjects
-
cslb b license generalcontractor exam
-
cslb b license general contractor exam if unused mortar stiffens due to hydration of cement
-
what must you do discard the mortar what minimum time must you w