SWR 301 Final Quiz | 50 Questions with 100% Correct Answers | Updated & Verified
How about estimating project size and effort from requirements? Based on Select one or more: a. the number of individually testable requirements (Wilson 1995) b. estimated lines of code needed to implement specific requirements c. story points (Cohn 2005; McConnell 2006) or use case points (Wiegers 2006) d. function points (Jones 1996b; IFPUG 2010) e. the number, type, and complexity of user interface elements - a,b,c,d,e Which of following is NOT true for customer involvement during the project lifecycle? Select one: a. On agile projects, customers (or a product owner who represents them) are engaged continuously throughout the project. b. On waterfall projects, customers typically dedicate considerable time up front c. Customers cannot change their requirements d. On waterfall projects, customers should also be involved later in the project during user acceptance testing, providing feedback on whether the product meets their needs - c What is not the essential aspects of an agile approach to requirements? Select one: a. Timing b. Budget change c. The backlog and prioritization d. Documentation detail e. Customer involvement f. Expect change - b
Document information
- Uploaded on
- November 12, 2022
- Number of pages
- 14
- Written in
- 2022/2023
- Type
- Exam (elaborations)
- Contains
- Questions & answers