• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 13 pages
Class notes

Operations Management Notes

Document preview thumbnail
Preview 2 out of 13 pages

These are all my notes from 2nd semester of 2nd year. This is part of the simulation module. The topics waiting lines, constraint management and forecast are central to this.

Content preview

OPM module Simulatie
Chapter 5 (6) – Constraint Management – Krajewski
Constraint = any factor that limits the performance of a system and restricts its output
Bottleneck = a capacity constraint resource (CCR) whose available capacity limits the
organization’s ability to meet the product volume, product mix, or demand fluctuation
required by the marketplace
Theory of constraints (TOC) = a systematic approach that focuses on actively managing
those constraints that impede a firm’s progress toward its goal




The key principles of the TOC
1. The focus should be on balancing flow, not on balancing capacity
2. Maximizing the output and efficiency of every resource may not maximize the
throughput of the entire system
3. An hour lost at a bottleneck or constrained resource is an hour lost for the whole
system
4. Inventory is needed only in front20* of bottlenecks to prevent the from sitting idle and
in front of assembly and shipping points to protect customer schedules
5. Work should be released into the system only as frequently as needed by the
bottlenecks
- Bottlenecks flows = market demand
6. Activating a non-bottleneck resource is not the same as utilizing a bottleneck
resource
- It doesn’t increase throughput or promote better performance
7. Every capital investment must be viewed from the perspective of the global impact on
overall throughput inventory, and operating expense

The theory of constraints
1. Identify the System Bottleneck(s)
2. Exploit the Bottleneck(s)
3. Subordinate All Other Decisions to Step 2
4. Elevate the Bottleneck(s)
5. Do Not Let Inertia Set In


1

, Managing Bottleneck in Service Processes:
- Throughput time = Total elapsed time from the start to the finish of a job or a
customer being processed at one or more work centers

Drum-Buffer-Rope (DBR) = A planning and control system that regulates the flow of work-
in-process materials at the bottleneck or the capacity constrained resource (CCR) in a
productive system
- The bottleneck schedule is the drum because it sets the beat or the production rate
for the entire plant and is linked to market demand
- Buffer = buffer that plans early flows into the bottleneck and thus protects it from
disruption.
- Rope = represents the tying of material release to the drumbeat, which is the rate at
which the bottleneck controls the throughput of the entire plant.
- Buffer management =represents the tying of material release to the drumbeat,
which is the rate at which the bottleneck controls the throughput of the entire plant.




2

Connected book
 image
Lee Krajewski, Naresh Malhotra Operations Management
Publisher: Unknown ISBN: 9781292259987 Edition: 12

Document information

Study
Uploaded on
May 23, 2022
Number of pages
13
Written in
2021/2022
Type
Class notes
Professor(s)
R. de roock
Contains
All classes
$5.15

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
6
Followers
5
Items
31
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions