• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 4 pages
Summary

Summary Operations Management

Document preview thumbnail
Preview 1 out of 4 pages

This summary shows the main topics of this course. This is part of the exam simulation. This summary contains chapter 5 and chapter 8 of the book operations management 12th edition. There is also chapter 5 of the book Russell which deals with Waiting line theories.

Content preview

Samenvatting OPM
Precedence diagram = A diagram that allows one to visualize immediate predecessors
better
- Activity-on-node (AON) = an approach used to create a network diagram, in which
nodes represent activities and arc represent the precedence relationship between
them.

Constructing a precedence diagram:
Desired output rate = Ideally is matched to the staffing or production plan
Cycle time = Maximum time allowed for work a unit at each station
Theoretical Minimum (TM) = benchmark or goal for the smallest number of
stations possible
- = total time required to assemble each unit
Idle time = the total unproductive time for all stations in the assembly of each unit
Efficiency = the ratio of productive time to total time, expressed as a percent



Balance Delay = the amount by which efficiency falls short of 100%
o Balance Delay (%) = 100% - Efficiency

Notatie Operating Characteristic
r Desired output rate in units per hour
c Cycle time in hours
TM Theoretical minimum
n Number of stations
Total time required to assemble each unit
L Average number of customers in the system (waiting and being served)
Lq Average number of customer in the waiting line
W Average time a customer spends in the system (waiting and being
served)
Wq Average time a customer spends waiting
P0 Probability of no customers in the system
Pn Probability of n customers in the system
ρ Utilization rate; the portion of time the system is in use
Et Forecast error for period t
Dt Actual demand in period t
Ft Forecast for period t
Y Dependent variable
X Independent variable
a Y-intercept of the line
b Slope of the line

Document information

Study
Uploaded on
May 23, 2022
Number of pages
4
Written in
2021/2022
Type
Summary
$5.16

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
6
Followers
5
Items
31
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions