• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Exam (elaborations)

DAU ISA 101 Module 2 Test

Document preview thumbnail
Preview 1 out of 3 pages

DAU ISA 101 Module 2 Test Capability Planning Exam Here is your test result.The dots represent the choices you have made. The highlighted questions are the questions you have missed. Remediation Accessed shows whether you accessed those links.'N' represents links not visited and 'Y' represents visited links. Back to Status page contains 6 Questions 1) You've identified a capability requirement that, if left unresolved, would lead to a critical mission failure. What capability document must you complete? [7.101.1.1 Given an overview of the DoD capability planning processes, its objectives and expected results, identify capability planning documents from a list.] UON ICD DCR Joint DCR 2) True or False. Performance Measures are identified in the Capability Need Identification phase of the BCAC. [7.101.1.2 Describe the Business Capability Acquisition Lifecycle (BCAC) model.] False True 3) True or False. Once an ICD is documented AND approved, it is not updated. [7.101.1.7 Identify the role of the ICD and IS ICD in the JCIDS process.] False True 4) What are key documents used specifically with Information Technology (IT) to define Information Technology capability requirements? (Select the two that apply.) [7.101.1.8 Identify how Sponsors use the ICD and IS ICD/IT Box to document IT capability requirements.]  IS ICD LCSP and TEMP SEP and ISP  IT Box 5) A Request for Proposal (RFP) is validated by the . (Fill in the blank.) [7.101.1.9 Identify the role of the CDD in the JCIDS process.] CDD CPD ICD Joint DCR 6) Match the JCIDS document to the appropriate characteristic. [7.101.1.10 Identify the role of the CPD in the JCIDS process.] a) IS ICD b) ICD c) CDD d) CPD e) Joint DCR f) UON Uses expedited staffing and validation procedures to enable the timely validation and initiation of rapid acquisition efforts. Leads to an AoA or similar review when a materiel approach to solving the capability gap and/or requirements is appropriate. Provides KPPs, KSAs and additional operational performance attributes that support the Technology Maturation & Risk Reduction Phase (TMRR) as well as the Engineering & Manufacturing Development (EMD) phase. Documents capability requirements and associated gaps where the intended solution approach involves the application of system software. Prepared during the Engineering and Manufacturing Development Phase and is used as an entrance criteria item necessary for each Milestone C acquisition decision. Proposes non-materiel capability solutions in one or more of the DOTmLPF-P areas as an alternative to, or compliment of, materiel capability solutions.

Content preview

DAU Page 1 of 2




DAU ISA 101 Module 2 Test


Capability Planning Exam
Here is your test result.The dots represent the choices you have
made. The highlighted questions are the questions you have
missed.
Remediation Accessed shows whether you accessed those links.'N' represents links not
visited and 'Y' represents visited links.
Back to Status page
contains 6 Questions


1) You've identified a capability requirement that, if left unresolved, would lead to a critical
mission failure. What capability document must you complete? [7.101.1.1 Given an overview of
the DoD capability planning processes, its objectives and expected results, identify capability planning
documents from a list.]


UON

ICD

DCR

Joint DCR


2) True or False. Performance Measures are identified in the Capability Need Identification phase
of the BCAC. [7.101.1.2 Describe the Business Capability Acquisition Lifecycle (BCAC) model.]

False
True

3) True or False. Once an ICD is documented AND approved, it is not updated. [7.101.1.7 Identify
the role of the ICD and IS ICD in the JCIDS process.]

False

True

4) What are key documents used specifically with Information Technology (IT) to define
Information Technology capability requirements? (Select the two that apply.) [7.101.1.8 Identify
how Sponsors use the ICD and IS ICD/IT Box to document IT capability requirements.]
 IS ICD

LCSP and TEMP

SEP and ISP
 IT Box


DAU

Document information

Uploaded on
April 4, 2022
Number of pages
3
Written in
2022/2023
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestSolutions
4.8
(53)
Sold
173
Followers
135
Items
2995
Last sold
1 year ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions